96 Application No. 2020/0822 - Land Off Flatts Lane, Calverton PDF 514 KB
Minutes:
Reserved matters approval (appearance, landscaping, layout and scale) for the erection of 82 dwellings and public open space pursuant to outline permission 2020/0726.
The Principal Planning Officer introduced the report and proposed to alter the wording of condition 3 in respect of the landscaping, to that identified below;
“Prior to above ground works commencing, a planting schedule for planting to the front of all residential plots shall be submitted to and approved in writing by the Local Planning Authority. The scheme as approved shall be implemented prior to the occupation of the plot to which the landscaping relates. The planting shown in the public open space shall be implemented prior to occupation of the first dwelling on-site. Any trees, shrubs or plants that due within a period of five years from the completion of each development phase, or are removed and/or become seriously damaged or diseased in that period, shall be replaced (and if necessary continue to be replaced) in the first available plating season with others of a similar size and species”’
He recommended that the application be granted reserved matters approval subject to the conditions within the report, and the updated condition 3 as previously read.
RESOLVED:
To Grant reserved matters approval, subject to the following conditions:
1. This permission shall be read in accordance with the application form and following list of approved drawings:
S0000/100/01/PLC Rev C Planning Layout Colour
S0000/100/01/PLC rev C Planning Layout black and White
House Type Pack
P20-0044_202 01 Lacemaker (3 bed) House type floor plans
P20-0044_202 02 Lacemaker (3 bed) House type elevations
P20-0044_201 01 Silversmith AS (4 Bed) House type floor plans/elevations
P20-0044_201 02 Silversmith OPP (4 Bed) House type floor plans/elevations
GL1320 01B Leap Proposals
Arboricultural Assessment by FPCR October 2020
Access Note 075666-CUR-00-XX-RP-TP-001-V02
The development shall thereafter be undertaken in accordance with these plans/details.
2. No above ground works shall commence until samples of external facing and roofing materials have been submitted to and approved in writing by the Local Planning Authority. Development shall thereafter be carried out in accordance with the approved details.
3. Prior to above ground works commencing, a planting schedule for planting to the front of all residential plots shall be submitted to and approved in writing by the Local Planning Authority. The scheme as approved shall be implemented prior to the occupation of the plot to which the landscaping relates. The planting shown in the public open space shall be implemented prior to occupation of the first dwelling on-site. Any trees, shrubs or plants that due within a period of five years from the completion of each development phase, or are removed and/or become seriously damaged or diseased in that period, shall be replaced (and if necessary continue to be replaced) in the first available plating season with others of a similar size and species.
4. Prior to above ground works commencing details of all walls (including retaining walls), fences, gates or other means of enclosure to be erected in or around the ... view the full minutes text for item 96