Development of 18no houses.

 

The Assistant Director – Planning and Regeneration introduced the report and informed members that further to the information contained in the report, a local labour agreement was considered to be necessary to comply with Policy LPD48 as the development met the threshold for an agreement. It was recommended that this was secured via a planning condition which was consistent with the method of securing such provision for the wider site.

 

The Assistant Director – Planning and Regeneration recommended that permission was granted in accordance with the report, but with an additional condition requiring the development to be undertaken in accordance with a local labour agreement, to be submitted to and approved in writing by the local planning authority.

 

RESOLVED:

 

To Grant Full Planning Permission: Subject to the owner entering into a Section 106 Agreement with the Borough Council as local planning authority and with the County Council as education authority for the provision of, or financial contributions towards Educational Facilities, Affordable Housing, and the provision of Open Space and its future maintenance and subject to the following conditions:

 

Conditions

 

1          The development must be begun not later than three years beginning with the date of this permission.

 

2          The development hereby permitted shall be completed in accordance with the submitted documents received on 13th July 2020:

 

Proposed Location Plan Dwg No. 02

Proposed Site Plan Dwg No. 01 Red D

Materials Plan  Dwg No. 03

Landscape Strategy Dwg No. 101

Proposed Boundary Treatment Plan Drawing No. 04

Outline Hardworks Surfaces Dwg No. 201

Tree Protection Plan Dwg No. RSE_3685_TPP Rev V1

 

House Types

 

Somerby Dwg No. SOM/WKDG/100/26/02 Rev CA

LowesbyDwg No. LOW/WKDG/100/75/03 Rev CA

WillesleyDwg No. WIL/WKDG/100/67/03 Rev CA

Dalby Dwg No. DALB/WKDG/100/73/02 Rev CA

Lichfield Dwg No. LIC/WKDG/100/30/03 Rev CA

Somerby (Brick Banding) Dwg No. SOM/WKDG/100/26/03 Rev CA

Worcester Dwg No. WOR/WKDG/100/10/04 Rev CA

 

 

The development shall thereafter be undertaken in accordance with these plans/details.

 

3             Prior to the first occupation every property built on the site with one or more dedicated vehicle parking spaces and/ or a garage shall be provided with access to an electric vehicle (EV) charge point. Charge points must have a minimum power rating output of 7kW on a dedicated circuit, capable of providing a safe overnight charge to an electric vehicle.

 

4             Prior to commencement of the development a Construction Emission Management Plan (CEMP) for minimising the emission of dust and other emissions to air during the site preparation and construction shall be submitted to and approved in writing by the Local Planning Authority. The CEMP must be prepared with due regard to the guidance set out in the IAQM Guidance on the assessment of dust from demolition and construction and include a site specific dust risk assessment. All works on site shall be undertaken in accordance with the approved CEMP unless otherwise agreed in writing by the Local Planning Authority.

 

5             No dwelling hereby approved shall be occupied untilall access driveways and parking  ...  view the full minutes text for item 67