Application No. 2018/0926 - Land on the North Side of Briarbank Avenue, Carlton

Minutes:

Erect 12 No. apartments (resubmission of 2018/0365).

 

The Service Manager – Development Services introduced the report.

 

RESOLVED to Grant planning permission subject to the following conditions:

 

Conditions

 

 1         The development must be begun not later than three years beginning with the date of this permission.

 

 2         This permission shall be read in accordance with the following plans and details submitted to the Local Planning Authority: application form, site location plan and drawing numbers 217:38:11, 217:38:12 and 217:38:14 all received on 17th September 2018 and drawing number 217:38:13B received on 22nd October 2018. The development shall thereafter be undertaken in accordance with these plans unless otherwise agreed in writing by the Local Planning Authority.

 

 3         No above ground construction works shall commence until samples of the proposed external facing materials to be used in the construction of the development have been submitted to, and approved in writing by, the Local Planning Authority and the development shall only be undertaken in accordance with the materials so approved and shall be retained as such thereafter.

 

 4         No building shall be occupied until a detailed scheme for the boundary treatment of the site, including the position, design and materials, and to include all boundaries or divisions within the site, has been submitted to and approved in writing by the local planning authority. The approved scheme shall be completed before the buildings are first occupied and shall be retained thereafter.

 

 5         Prior to the erection of any external lighting there shall be submitted to and approved in writing by the Local Planning Authority details of all such lighting, including levels of illumination and a lux plot of the estimated luminance, to be provided on the approved buildings or elsewhere within the site.  Any security lighting/floodlighting to be installed, shall be designed, located and installed so as not to cause a nuisance to users of the highway or adjacent properties. The external lighting shall be provided in accordance with the approved details and shall be retained for the lifetime of the development.

 

 6         Prior to the first occupation of the building hereby approved there shall be submitted to and approved by the Local Planning Authority a landscape plan of the site showing the position, type and planting size of all trees, hedges, shrubs or seeded areas proposed to be planted.  The approved landscape plan shall be carried out in the first planting season following the first occupation of the development.  If within a period of five years beginning with the date of the planting of any tree, hedge, shrub or seeded area, that tree, shrub, hedge or seeded area, or any tree, hedge, shrub or seeded area that is planted in replacement of it, is removed, uprooted or destroyed or dies, or becomes in the opinion of the Local Planning Authority seriously damaged or defective, another tree, shrub or seeded area of the same species and size as that originally planted shall be planted at the same place.

 

 7         Before development is commenced there shall be submitted to and approved in writing by the Borough Council details of a Local Employment Agreement to cover the construction of the development hereby permitted.  The Local Employment Agreement shall be implemented in accordance with the approved details.

 

 8         No part of the development hereby permitted shall be brought into use until the parking and turning areas are surfaced in a bound material with the parking bays clearly delineated in accordance with drawing number 217:38:13B. The parking, and turning areas shall be maintained in the bound material for the life of the development and shall not be used for any purpose other than the parking, turning and loading and unloading of vehicles.

 

 9         No part of the development hereby permitted shall be brought into use until the bin collection area is constructed in the location shown on approved drawing number 217.38.13B.

 

10        No part of the development hereby permitted shall be brought into use until the secure cycle storage as indicated on drawing 217:38:13B has been provided and that area shall not thereafter be used for any purpose other than the parking of cycles.

 

11        Unless otherwise agreed by the Local Planning Authority, development must not commence until the following has been complied with:

 

            Site Characterisation

            An assessment of the nature and extent of any potential contamination has been submitted to and approved in writing by the Local Planning Authority. This assessment must be undertaken by a competent person, and shall assess any contamination on the site, whether or not it originates on the site. Moreover, it must include; a survey of the extent, scale and nature of contamination and; an assessment of the potential risks to: human health, property, adjoining land, controlled waters, ecological systems, archaeological sites and ancient monuments.

 

            Submission of Remediation Scheme.

            Where required following the site characterisation assessment, a detailed remediation scheme (to bring the site to a condition suitable for the intended use by removing unacceptable risks to critical receptors) shall be submitted to and approved in writing by the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, an appraisal of remedial options, and proposal of the preferred option(s), and a timetable of works and site management procedures. In the event that remediation is required to render the development suitable for use, the agreed remediation scheme shall be implemented in accordance with the approved timetable of works. Prior to occupation of any building(s) a Verification Report (that demonstrates the effectiveness of the remediation carried out) must be submitted and approved in writing by the Local Planning Authority.

 

12        In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority and once the Local Planning Authority has identified the part of the site affected by the unexpected contamination development must be halted on that part of the site. An assessment must be undertaken in accordance with the requirements set out in Condition 12 above, and where remediation is necessary a remediation scheme, together with a timetable for its implementation and verification reporting, must be submitted to and approved in writing by the Local Planning Authority.

 

13        No development shall commence on site in connection with the development thereby approved (including demolition works, tree works, fires, soil moving, temporary access construction and / or widening or any operations involving the use of motorised vehicles or construction machinery) until a detailed Arboricultural Method Statement (AMS) in accordance with BS5837:2012Trees in relation to design, demolition and construction - Recommendations has been submitted to and approved in writing by the Local Planning Authority and any protective fencing is erected as required by the AMS. The AMS shall include full details of the following:

            a) Timing and phasing of Arboricultural works in relation to the approveddevelopment.

            b) Details of a tree protection scheme in accordance with BS5837:2012:which provides for the retention and protection of trees, shrubs and hedges on and adjacent to the site.

            c) Details of any construction works required within the root protection area of trees, hedges or shrubs on and adjacent to the site, as defined by BS5837:2012.

            d) Details of the arrangements for the implementation, supervision and monitoring of works required to comply with the arboricultural method statement.

 

14        Prior to commencement of the development a Construction Emission Management Plan (CEMP) for minimising the emission of dust and other emissions to air during the site preparation and construction shall be submitted to and approved in writing by the Local Planning Authority.  The CEMP must be prepared with due regard to the guidance set out in the IAQM Guidance on the assessment of dust from demolition and construction and include a site specific dust risk assessment.  All works on site shall be undertaken in accordance with the approved CEMP unless otherwise agreed in writing by the Local Planning Authority.

 

15        Prior to the erection of any bin store structure, details shall first be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be undertaken in accordance with the approved details.

 

16        No above ground construction works shall commence until details of bat and bird boxes to be incorporated within the fabric of the buildings and/or within the site have been submitted to and approved in writing by the Local Planning Authority. The bat and bird boxes shall thereafter be provided prior to the first occupation of the development hereby approved.

 

Reasons

 

 1         In order to comply with Section 51 of the Planning and Compulsory Purchase Act 2004.

 

 2         For the avoidance of doubt and to define the terms of this permission.

 

 3         To ensure a satisfactory standard of external appearance.

 

 4         To ensure a satisfactory standard of external appearance and in the interests of residential amenity.

 

 5         In the interests of residential amenity.

 

 6         In the interests of visual amenity.

 

 7         To ensure that the construction of the development provides appropriate employment and training opportunities.

 

 8         To ensure that adequate off-street parking provision is made to reduce the possibilities of the proposed development leading to on-street parking in the area.

 

 9         For ease of collection by the refuse team, and located within the 25m pulling distance.

 

10        To promote sustainable transport.

 

11        To ensure that land contamination matters are fully addressed.

 

12        To ensure that land contamination matters are fully addressed.

 

13        To ensure that existing trees are adequately protected.

 

14        To ensure the development is constructed in an appropriate sustainable manner which takes into consideration air quality with in the Borough.

 

15        In the interests of visual and residential amenity.

 

16        In the interests of enhancing ecological provision on the site.

 

Reasons for Decision

 

The development would be of height that is acceptable within the context of the surrounding area and would not have an adverse impact upon visual amenity, residential amenity or highway safety. The proposal is therefore considered to meet with the objectives of the National Planning Policy Framework, Aligned Core Strategy Policies, A, 1, 8 and 10 and Local Planning Document Policies 11, 20, 32, 33, 35, 37, 40, 48, 57, 61.

 

Notes to Applicant

 

The applicant is advised that all planning permissions granted on or after 16th October 2015 may be subject to the Community Infrastructure Levy (CIL). Full details of CIL are available on the Council's website. The proposed development has been assessed and it is the Council's view that CIL IS PAYABLE on the development hereby approved as is detailed below. Full details about the CIL Charge including, amount and process for payment will be set out in the Regulation 65 Liability Notice which will be sent to you as soon as possible after this decision notice has been issued. If the development hereby approved is for a self-build dwelling, residential extension or residential annex you may be able to apply for relief from CIL. Further details about CIL are available on the Council's website or from the Planning Portal: www.planningportal.gov.uk/planning/applications/howtoapply/whattosubmit/cil

 

The Borough Council has worked positively and proactively with the applicant in accordance with paragraph 38 of the National Planning Policy Framework (2018). No amendments were considered to be necessary to the proposal as originally submitted.

 

The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to The Coal Authority on 0845 762 6848. Further information is also available on The Coal Authority website at ww.coal.decc.gov.uk Property specific summary information on past, current and future coal mining activity can be obtained from the Coal Authority's Property Search Service on 0845 762 6848 or at www.groundstability.com

 

In order to carry out the off-site works required you will be undertaking work in the public highway which is land subject to the provisions of the Highways Act 1980 (as amended) and therefore land over which you have no control. In order to undertake the works you will need to enter into an agreement under Section 278 of the Act. Please contact Daniel Sullivan 01159 773991 for details.

 

It is an offence under S148 and S151 of the Highways Act 1980 to deposit mud on the public highway and as such you should undertake every effort to prevent it occurring

 

When considering carrying out any work to trees it is important to consider the provisions made in the Wildlife and Countryside Act 1981, Conservation (natural habitats) Regulations 1994 and the Countryside Rights of Way Act 2000, which mean it is an offence to intentionally or recklessly kill, injure or take a bat, Intentionally or recklessly damage, destroy or obstruct access to any structure or place used for shelter or protection by a bat, Intentionally or recklessly disturb a bat while it is occupying a structure or place that it uses for shelter or protection, damage, destroy or block access to the resting place of any bat, Intentionally or recklessly kill, injure or take a wild bird, Intentionally or recklessly take, damage or destroy the nest of any wild bird when it is in use or being built, Intentionally or recklessly take, damage or destroy the egg of any wild bird. These points outline the main parts of the above legislation. If you are unsure about these issues, it would be advisable to contact an ecological consultant before undertaking any tree work operations.

 

Consideration should be given to providing suitable electrical sockets to allow for the charging of electric vehicles on the site.

 

 