Agenda item

Planning Application 2018/0318 - Eden Lodge Care Home, Park Road, Bestwood.

Minutes:

Demolition of the existing Eden Lodge Care home and construction of a new build 64 bed residential care home

 

The Service Manager – Development Services introduced the report.

 

RESOLVED that the Borough Council GRANTS OUTLINE PLANNING PERMISSION with matters relating to Appearance and Landscaping for subsequent approval, and subject to the following conditions:

 

Conditions

 

 1         Approval of the details of landscaping and appearance (hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority before the commencement of any development.

 

 2         Application for the approval of reserved matters must be made not later than three years from the date of the outline permission and the development to which this permission relates must be begun within two years from the date of final approval of reserved matters

 

 3         The submission of all reserved matters and the implementation of the development shall be carried out in substantial accordance with the plans and documents received on the 22nd March 2018 and the revised plans received 3rd May 2018: - Application Forms; Design and Access Statement; First Floor Plan (2349(08)009; Proposed Attic Floor Plan (2349(08)010); Boundary Treatments Site A + Site B (2349(08)011; Site A (Care Home) Site Sections. Sheet 1 (2349(08)S01 A); Site A (Care Home) Site Sections. Sheet 2 (2349(08)S02; Street Visualisation from Sports Ground looking north 2349(08)V03;  Street Visualisation from Moor Road (2349(08)V04; Street Visualisation from Bowling Green (2340(08)V05; Street Visualisation from Park Road 2349(08)V06; Aerial View 1 (2349(08)V07; Aerial View 2 (2349(08)V08; Aerial View 3 (2349(08)V09; Existing Site Plan Constraints Care Home (2349(08)003; Location Plan; Transport Statement; Arboricultural Survey Report & Method Statement (Nov 2017); Tree Retention and Protection (2349(08)004 Rev B; Site Plan - Care Home Development (2349(08)005 Rev B; Site Plan - Care Home Development (2349(08)006 Rev A; and Ground Floor Plan (2349(08)008 Rev A.

 

 4         No part of the development hereby permitted shall be brought into use until the parking, turning and servicing areas are surfaced in a bound material with the parking bays clearly delineated in accordance with drawing number (Drawing ref: 2349 (08) 005 RevB). The parking, turning and servicing areas shall be maintained in the bound material for the life of the development and shall not be used for any purpose other than the parking, turning and loading and unloading of vehicles.

 

 5         Before development is commenced on site there shall be submitted to and approved in writing by the Borough Council, details of a surface water drainage scheme for the site, based on sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development.  The surface water drainage scheme shall subsequently be implemented in accordance with the approved details before the development is completed and shall be retained for the lifetime of the development.

 

 6         The detailed plans and particulars to be submitted to the Local Planning Authority as reserved matters in relation to landscaping shall include: (a) details of the size, species, positions and density of all trees and shrubs to be planted; (b) details of the boundary treatments, including those to individual plot boundaries; (c) the proposed means of surfacing access roads, car parking areas, roadways and the frontages of the premises such as driveways and footpaths to access doors and (d) a programme of implementation. The development shall be implemented in accordance with the approved details, which shall be retained for the lifetime of the development, unless otherwise prior agreed in writing by the Borough Council.

 

 7         If within a period of five years beginning with the date of the planting of any tree or shrub, approved as reserved matters in relation to landscaping, that tree or shrub, or any tree or shrub that is planted in replacement of it, is removed, uprooted or destroyed or dies, or becomes in the opinion of the Borough Council seriously damaged or defective, another tree or shrub of the same species and size as that originally planted shall be planted at the same place, unless otherwise prior agreed in writing by the Local Planning Authority.

 

 8         Before development has commenced there shall be submitted to and approved in writing a Bat Scoping Survey and Mitigation Strategy for all buildings that are to be demolished. Once approved the development shall be carried out strictly in accordance with the approved Bat Scoping Survey and Method Statement.

 

 9         Unless otherwise agreed by the Local Planning Authority, development must not commence until the following has been complied with: Site Characterisation: An assessment of the nature and extent of any potential contamination has been submitted to and approved in writing by the Local Planning Authority. This assessment must be undertaken by a competent person, and shall assess any contamination on the site, whether or not it originates on the site. Moreover, it must include; a survey of the extent, scale and nature of contamination and; and assessment of the potential risks to: human health, property, adjoining land, controlled waters, ecological systems, archaeological sites and ancient monuments. Submission of Remediation Scheme: Where required, a detailed remediation scheme (to bring the condition suitable for the intended use by removing unacceptable risks to critical receptors) should be submitted to and approved in writing by the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, an appraisal of remedial options, and proposal of the preferred option(s), and a timetable of works and site management procedures.

 

10        In the event that remediation identified in the Remediation Scheme is required to render the development suitable for use, the agreed remediation scheme shall be implemented in accordance with the approved timetable of works. Prior to occupation of any building(s) a Verification Report (that demonstrates the effectiveness of the remediation carried out) must be submitted and approved in writing by the Local Planning Authority.

 

11        In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority and once the Local Planning Authority has identified the part of the site affected by the unexpected contamination development must be halted on that part of the site. Prior to the first occupation of the development an Assessment must be undertaken in accordance with the requirements above, and where remediation is necessary a remediation scheme, together with a timetable for its implementation and verification reporting, must be submitted to and approved in writing by the Local Planning Authority.

 

12        No development shall take place until a Construction Environmental Method Statement has been submitted to, and approved in writing by, the local planning authority. The approved Statement shall be adhered to throughout the construction period of the development. The Statement shall provide for: (i) the parking of vehicles of site operatives and visitors; (ii) loading and unloading of plant and materials; (iii) storage of plant and materials used in constructing the development; (iv) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; (v) wheel washing facilities; (vi) measures to control the emission of dust and dirt during construction; (vii) a scheme for recycling/disposing of waste resulting from demolition and construction works.

 

13        Before development is commenced there shall be submitted to and approved in writing by the Borough Council details of a Local Employment Agreement to cover the construction of the development hereby permitted and the creation of new jobs in the local area.  The Local Employment Agreement shall be implemented strictly in accordance with the approved details, unless otherwise prior agreed in writing by the Local Planning Authority.

 

Reasons

 

 1         To comply with the requirements of Section 92 of the Town and Country Planning Act 1990. The application is expressed to be in outline only in accordance with Article 5 of the Town and Country Planning (Development Management Procedure)(England) Order 2015.

 

 2         To comply with the requirements of Section 92 of the Town and Country Planning Act 1990.

 

 3         For the avoidance of doubt.

 

 4         To ensure that adequate off-street parking provision is made to reduce the possibilities of the proposed development leading to on-street parking in the area.

 

 5         To prevent the increased risk of flooding; to improve and protect water quality; to improve habitat and amenity; and to ensure the future maintenance of the sustainable drainage structures, in accordance with the National Planning Policy Framework and  Policies 1 and 17 of the Aligned Core Strategy Submission Documents.

 

 6         To ensure a satisfactory development and that the landscaping of the development as proposed at reserved matters stage accords with LPD35.

 

 7         To ensure a satisfactory development and that the landscaping of the development as proposed at reserved matters stage accords with LPD35.

 

 8         To ensure that practicable and effective measures are taken to protect bats and their roosts during the construction of the development in accordance with LPD18.

 

 9         To ensure that practicable and effective measures are taken to treat, contain or control any contamination and to protect controlled waters in accordance with the aims of LPD7 and LPD10.

 

10        To ensure that practicable and effective measures are taken to treat, contain or control any contamination and to protect controlled waters in accordance with the aims of LPD7.

 

11        To ensure that practicable and effective measures are taken to treat, contain or control any contamination and to protect controlled waters in accordance with the aims of LPD7.

 

12        To protect the residential amenity of the area in accordance with the aims of Section 15 of the National Planning Policy Framework and Policy 10 of the Aligned Core Strategy for Gedling Borough (September 2014) and Policy LPD32 (Amenity).

 

13        To seek to ensure that the development provides appropriate employment and training opportunities, in accordance with Policy 4 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

Reasons for Decision

 

The development has been considered in accordance with the National Planning Policy Framework, the Aligned Core Strategy for Gedling Borough (September 2014) and the Local Planning Document 2017, where appropriate.  In the opinion of the Borough Council, the proposed development largely accords with the relevant policies of these frameworks and plans. Where the development conflicts with the Development Plan, it is the opinion of the Borough Council that other material considerations indicate that permission should be granted.

 

Notes to Applicant

 

The detailed surface water drainage scheme to be submitted shall:  - require all flows to be attenuated to Qbar for the entire site;- include provision for the entire site to be drained to the surface water drainage system with appropriate run-off coefficients or other factors used to represent the differing run off characteristics of the various parts of the site;- include an exceedance check using microdrainage software to simulate the drainage system for the 100year + 30% climate change event for a range of durations from 15 minutes to 24 hours to assess where the drainage system may flood. If this occurs, provision must be made for the accumulated volumes and flows to be directed to the surface water attenuation areas; - demonstrate that the surface water drainage system is designed in accordance with CIRIA C635 and C753, and the National SUDS Standards;- demonstrate detailed design (plans, network details and calculations) in support of any surface water drainage scheme, including details of any attenuation system, and outfall arrangements. Calculations should demonstrate the performance of the designed system for a range of return periods and storm durations inclusive of the 1 in 1 year, 1 in 2 year, 1 in 30 year, 1 in 100 year plus climate change return periods;- confirm how on-site surface water drainage systems will be adopted and maintained in perpetuity to ensure long term operation at the designed parameters.

 

The attached permission is for development which will involve building up to, or close to, the boundary of the site.  Your attention is drawn to the fact that if you should need access to neighbouring land in another ownership in order to facilitate the construction of the building and its future maintenance you are advised to obtain permission from the owner of the land for such access before beginning your development.

 

Your attention is drawn to an informal planning guidance document which has been produced to try and define what sustainable development means in the context of air quality, and how to decrease levels by incorporating mitigation measures into scheme design as standard. (see: http://gedling.gov.uk/planningbuildingcontrol/planningpolicy/emerginglocalplan/supplementaryplanningdocuments/). It is therefore requested commitment to incorporate provision for an EV (electrical vehicle) charging point per dwelling; to allow future residents to charge electrical/hybrid vehicles into the future. Reference can be made to guidance produced by IET 'Code of Practice for EV Charging Equipment Installation' for details of charging points and plugs specifications.

 

The applicant is advised that all planning permissions granted on or after 16th October 2015  may be subject to the Community Infrastructure Levy (CIL). Full details of CIL are available on the Council's website. The proposed development has been assessed and it is the Council's view that CIL is not payable on the development hereby approved as the development type proposed is zero rated in this location.

 

The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to The Coal Authority on 0845 762   6848. Further information is also available on The Coal Authority website at www.coal.decc.gov.uk.Property specific summary information on past, current and future coal mining activity can be obtained from The Coal Authority's Property Search Service on 0845 762 6848 or at www.groundstability.com.

 

Planning Statement - The Borough Council has worked positively and proactively with the applicant in accordance with paragraph 38 of the National Planning Policy Framework (2018). Negotiations have taken place during the determination of the application to address adverse impacts identified by officers. Amendments have subsequently been made to the proposal, addressing the identified adverse impacts, thereby resulting in a more acceptable scheme and a favourable recommendation.

 

Public sewers have statutory protection by virtue of the Water Industry Act 1991, as amended by the Water Act 2003, and you may not build close to, directly over or divert a public sewer without consent.  You are advised to contact Severn Trent Water to discuss your proposals.  Severn Trent Water will seek to assist you in obtaining a solution which protects both the public sewer and the proposed development.  If you require further information, please contact Severn Trent Water on 0116 234 3834.

 

Date Recommended: 20th August 2018

 

Supporting documents: