Agenda item

Application No. 2014/0238 - Land West of Westhouse Farm

Minutes:

Proposed residential development for 101 market dwelling units, new access, amenity space, open space.

 

The Service Manager – Development Services introduced the report.

 

RESOLVED that the Borough Council GRANTS OUTLINE PLANNING PERMISSION, subject to the applicant entering into a Section 106 Agreement with the Borough Council as local planning authority and with the County Council as local highway and education authority for the provision of, or financial contributions towards, Open Space, Healthcare Facilities, Integrated Transport, Management Company and Educational Facilities; and subject to the following conditions:   

 

Conditions

 

 1         Approval of the details of Appearance, Landscaping, Layout and Scale (hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority before the commencement of any development.

 

 2         Application for the approval of reserved matters must be made not later than three years from the date of the outline permission and the development to which this permission relates must be begun within two years from the date of final approval of reserved matters.

 

 3         The vehicular access hereby permitted shall be constructed strictly in accordance with the Proposed Site Access drawing (13152-010), deposited on 28th February 2014.

 

 4         In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Borough Council and once the Borough Council has identified the part of the site affected by the unexpected contamination development must be halted on that part of the site.  An assessment must be undertaken and, where remediation is necessary, a remediation scheme, together with a timetable for its implementation and verification reporting, must be submitted to and approved in writing by the Borough Council.  The Remediation Scheme shall be implemented as approved.

 

 5         In the event that remediation is required to render the development suitable for use, a written remediation scheme and timetable of works shall be submitted to and approved in writing by the Borough Council.  The scheme shall then be implemented in accordance with the approved details.  Prior to the development being first brought into use, a Verification Report (that satisfactorily demonstrates the effectiveness of the remediation carried out and identifying any requirements for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action) must be submitted to and approved in writing by the Borough Council.

 

 6         No development shall take place until a Construction Environmental Method Statement has been submitted to, and approved in writing by, the local planning authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide for: (i) the parking of vehicles of site operatives and visitors; (ii) loading and unloading of plant and materials; (iii) storage of plant and materials used in constructing the development; (iv) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; (v) wheel washing facilities; (vi) measures to control the emission of dust and dirt during construction; (vii) a scheme for recycling/disposing of waste resulting from demolition and construction works.

 

 7         Before development is commenced there shall be submitted to and approved in writing by the Borough Council details of the new road, including longitudinal and cross sectional gradients, visibility splays, Traffic Regulation Orders, street lighting, drainage and outfall proposals, construction specification, provision of and diversion of utilities services, and any proposed structural works.  All details submitted to the Borough Council for approval shall comply with the County Council's Highway Design and Parking Guides which are current at the time the details are submitted.  The development shall be implemented in accordance with the approved details, which shall be retained for the lifetime of the development, unless otherwise prior agreed in writing by the Borough Council.

 

 8         No development shall commence on any part of the application site unless or until; (1) a suitable access arrangement, as shown for indicative purposes on drawing number 13152-010; (2) the provision of pedestrian links and a suitable crossing point to the nearby bus stops; (3) the provision of upgrades to the public footpath link to the NET tram stop at Butlers Hill, as well as cycle links to the Leen Valley Country Park; and (4) the provision of a new 'Gateway' treatment and extended traffic calming zone for Moor Road; have been provided to the satisfaction of the Local Planning Authority.

 

 9         Before development is commenced there shall be submitted to and approved in writing by the Borough Council details of a surface water drainage scheme for the site based on sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development.  The scheme shall subsequently be implemented in accordance with the approved details before the development is completed and shall be retained for the lifetime of the development.  The scheme to be submitted shall demonstrate: (1) The utilisation of holding sustainable drainage techniques which incorporate at least two differing forms of SuDS treatment in accordance with Table 3.3 of CIRIA C697 'The SuDS Manual' prior to discharging from the site; (2) The limitation of surface water run-off to the equivalent Greenfield runoff rate; (3) The ability to accommodate surface water run-off on-site up to the critical 1 in 100 year event plus an appropriate allowance for climate change, based upon the submission of drainage calculations; and (4) Responsibility for the future maintenance of drainage features.

 

10        Before development is commenced, there shall be submitted to and approved in writing by the Borough Council details of an archaeological scheme of treatment.  The scheme shall include post-determination evaluation beginning with a scheme of geophysical survey, possibly with a subsequent scheme of trial trenching and/or archaeological monitoring, as deemed necessary.  The scheme shall be implemented strictly in accordance with the approved details.

 

11        Before development is commenced there shall be submitted into and approved in writing by the Local Planning Authority, (1) A tree protection plan to graphically show the locations of any tree and root protection barriers; (2) Arboricultural impact assessment identifying what impacts might arise from the proposed works; (3) Arboricultural Method Statement to give guidance on aspects of proposed works which were identified within the arboricultural impact assessment. The AMS provides guidance as to how works might be mitigated or compensated for; (4) Details of any special engineering works and surfacing required near trees. The approved measures of protection shall be implemented strictly in accordance with the approved details for the duration of the construction period.

 

12        Before development is commenced there shall be submitted to and approved in writing by the Borough Council details of a 'bat friendly' lighting scheme to ensure that artificial lighting (including any construction site lighting and compound lighting), avoids illuminating boundary features such as hedgerows and other areas of retained or created habitat (including the balancing pond).  The scheme shall be implemented strictly in accordance with the approved details.

 

13        Before development is commenced, there shall be submitted to and approved in writing by the Borough Council details of a scheme for the incorporation of integrated bird and bat boxes within the fabric of a proportion of the houses; bird boxes should target species such as house sparrow, swallow and swift. The scheme shall be implemented strictly in accordance with the approved details before the development is first brought into use and shall be retained for the lifetime of the development.

 

14        Before development is commenced, including any vegetation clearance or ground works, there shall be submitted to and approved in writing by the Borough Council a reptile method statement to ensure the field margins are cleared sensitively.  The method statement shall be implemented strictly in accordance with the approved details before the development is first commenced.

 

15        No vegetation clearance or ground works shall be undertaken until the site has been walked by an ecologist to ensure that badgers have not moved onto the site.  If any badgers are found to be present, details of any mitigation measures that may be deemed necessary shall be submitted to and approved in writing by the Borough Council before vegetation clearance or ground works commence.  The mitigation measures shall be implemented in accordance with the approved details before development commences.

 

16        During the construction phase, if any trenches are left open overnight, they should be left with a sloping end or ramp to allow badgers or other mammals that may fall into the excavation to escape, and any pipes over 150 mm in diameter should be capped off at night to prevent mammals from entering them.

 

17        The detailed plans and particulars to be submitted as reserved matters in relation to scale shall include details of existing and proposed site levels in relation to adjacent properties.  The development shall be implemented in accordance with the approved details, unless otherwise prior agreed in writing by the Borough Council.

 

18        The detailed plans and particulars to be submitted as reserved matters in relation to appearance shall include details of the materials to be used in the external elevations and roofs of the proposed buildings.  The development shall be carried out in accordance with the approved details, which shall be retained for the lifetime of the development, unless otherwise prior agreed in writing by the Borough Council.

 

19        The detailed plans and particulars to be submitted as reserved matters in relation to landscaping shall include: (a) details of the size, species, positions and density of all trees and shrubs to be planted, which shall consist of native species, ideally of local provenance, where possible; (b) details of the boundary treatments, including those to individual plot boundaries; (c) the proposed means of surfacing access roads, car parking areas, roadways and the frontages of properties such as driveways and footpaths to front doors and (d) a programme of implementation. The development shall be implemented in accordance with the approved details, which shall be retained for the lifetime of the development, unless otherwise prior agreed in writing by the Borough Council.

 

20        If within a period of five years beginning with the date of the planting of any tree or shrub, approved as reserved matters in relation to landscaping, that tree or shrub, or any tree or shrub that is planted in replacement of it, is removed, uprooted or destroyed or dies, or becomes in the opinion of the Borough Council seriously damaged or defective, another tree or shrub of the same species and size as that originally planted shall be planted at the same place.

 

21        Any garage doors shall be set back from the highway boundary a minimum distance of 5 metres for sliding or roller shutter doors, 5.5 metres for up and over doors or 6 metres for doors opening outwards.  The garage doors shall be retained to this specification for the lifetime of the development.

 

Reasons

 

 1         To comply with the requirements of Section 92 of the Town and Country Planning Act 1990. The application is expressed to be in outline only in accordance with Article 5 of the Town and Country Planning (Development Management Procedure)(England) Order 2015.

 

 2         To comply with the requirements of Section 92 of the Town and Country Planning Act 1990.

 

 3         For the avoidance of doubt.

 

 4         To ensure that practicable and effective measures are taken to treat, contain or control any contamination and to protect controlled waters in accordance with the aims of Policies ENV1 and ENV3 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

 5         To ensure that practicable and effective measures are taken to treat, contain or control any contamination and to protect controlled waters in accordance with the aims of Policies ENV1 and ENV3 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

 6         To protect the residential amenity of the area in accordance with the aims of Section 11 of the National Planning Policy Framework and Policy 10 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

 7         To ensure that the roads of the proposed development are designed to an adoptable standard in order to accord with Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

 8         To ensure an adequate form of development in the interests of highway safety in accordance with Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

 9         To prevent the increased risk of flooding; to improve and protect water quality; to improve habitat and amenity; to ensure the future maintenance of the sustainable drainage structures; and to protect the water environment from pollution, in accordance with the National Planning Policy Framework and  Policies 1 and 17 of the Aligned Core Strategy Submission Documents.

 

10        To ensure the appropriate investigation and recording of archaeological features, in accordance with Section 12 of the National Planning Policy Framework and Policy 11 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

11        To minimise any potential impacts on biodiversity and the landscape in accordance with Section 11 of the National Planning Policy Framework and Policy 17 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

12        To minimise any potential impacts on biodiversity in accordance with Section 11 of the National Planning Policy Framework and Policy 17 of the Aligned Core Strategy for Gedling (September 2014).

 

13        To enhance biodiversity in accordance with Section 11 of the National Planning Policy Framework and Policy 17 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

14        To minimise any potential impacts on biodiversity in accordance with Section 11 of the National Planning Policy Framework and Policy 17 of the Aligned Core Strategy for Gedling (September 2014).

 

15        To minimise any potential impacts on biodiversity in accordance with Section 11 of the National Planning Policy Framework and Policy 17 of the Aligned Core Strategy for Gedling (September 2014).

 

16        To minimise any potential impacts on biodiversity in accordance with the National Planning Policy Framework and Policy 17 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

17        To ensure a satisfactory development in accordance with the aims of Policy 10 of the Aligned Core Strategy for Gedling Borough (September 2014) and Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

18        To ensure a satisfactory development in accordance with the aims of Policy 10 of the Aligned Core Strategy for Gedling Borough (September 2014) and Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

19        To ensure that the landscaping of the proposed development accords with Policy 10 of the Aligned Core Strategy for Gedling Borough (September 2014) and Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

20        To ensure a satisfactory development, in accordance with Policy 10 of the Aligned Core Strategy for Gedling Borough (September 2014) and Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

21        In the interests of highway safety in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

Reasons for Decision

 

The development has been considered in accordance with the National Planning Policy Framework, the Aligned Core Strategy for Gedling Borough (September 2014) The Gedling Borough Replacement Local Plan (Certain Policies Saved 2014), and the Local Planning Document Part 2 where appropriate.  In the opinion of the Borough Council, the proposed development largely accords with the relevant policies of these frameworks and plans.  Where the development conflicts with the Development Plan, it is the opinion of the Borough Council that other material considerations indicate that permission should be granted.  The benefits of granting the proposal outweigh any adverse impact of departing from the Development Plan.

 

Notes to Applicant

 

It is an offence under S148 and S151 of the Highways Act 1980 to deposit mud on the public highway and as such you should undertake every effort to prevent it occurring.

 

The applicant should note that notwithstanding any planning permission that if any highway forming part of the development is to be adopted by the Highways Authority. The new roads and any highway drainage will be required to comply with the Nottinghamshire County Council's current highway design guidance and specification for roadworks.

 

The Advanced Payments Code in the Highways Act 1980 applies and under section 219 of the Act payment will be required from the owner of the land fronting a private street on which a new building is to be erected.  The developer should contact the Highway Authority with regard to compliance with the Code, or alternatively to the issue of a Section 38 Agreement and bond under the Highways Act 1980.  A Section 38 Agreement can take some time to complete. Therefore, it is recommended that the developer contact the Highway Authority as early as possible.

 

It is strongly recommended that the developer contact the Highway Authority at an early stage to clarify the codes etc. with which compliance will be required in the particular circumstance, and it is essential that design calculations and detailed construction drawings for the proposed works are submitted to and approved by the County Council (or District Council) in writing before any work commences on site.

 

In order to carry out the off-site works required you will be undertaking work in the public highway which is land subject to the provisions of the Highways Act 1980 (as amended) and therefore land over which you have no control. In order to undertake the works you will need to enter into an agreement under Section 278 of the Act.All correspondence with the Highway Authority should be addressed to: TBH - NCC (Highways Development Control) (Floor 8), Nottinghamshire County Council, County Hall, Loughborough Road, West Bridgford,  Nottingham, NG2 7QP.

 

The Environment Agency advises that condition 8 should not be altered without its prior notification to ensure that the above requirements can be incorporated into an acceptable drainage scheme that reduces the risk of flooding.

 

The Environment Agency does not consider oversized pipes or box culverts as sustainable drainage.  Should infiltration not be feasible at the site, alternative above ground sustainable drainage should be used.

 

The Environment Agency advises that surface water run-off should be controlled as near to its source as possible through a sustainable drainage approach to surface water management.  Sustainable Drainage Systems (SuDS) are an approach to managing surface water run-off which seeks to mimic natural drainage systems and retain water on-site, as opposed to traditional drainage approaches which involve piping water off-site as quickly as possible.

 

The Environment Agency advises that SuDS involve a range of techniques, including methods appropriate to impermeable sites that hold water in storage areas e.g. ponds, basins, green roofs etc rather than just the use of infiltration techniques.  Support for the SuDS approach is set out in NPPF.

 

The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to The Coal Authority on 0845 762   6848. Further information is also available on The Coal Authority website at www.coal.decc.gov.uk.Property specific summary information on past, current and future coal mining activity can be obtained from The Coal Authority's Property Search Service on 0845 762 6848 or at www.groundstability.com.

 

The Borough Council has worked positively and proactively with the applicant, in accordance with paragraphs 186 and 187 of the National Planning Policy Framework, based on seeking solutions to problems arising in relation to dealing with the planning application. This has been achieved by meeting the applicant to discuss issues raised, providing details of issues raised in consultation responses; requesting clarification, additional information or drawings in response to issues raised; and providing updates on the application's progress.

 

The County Council Rights of Way require that the availability of the Bestwood St Albans Parish Footpath No.3, which runs alongside the northern boundary of the site, is not affected or obstructed in any way by the proposed development at this location, unless subject to appropriate diversion or closure orders.  The County Council should be consulted on any re-surfacing or gating issues and the developers should be aware of potential path users in the area, who should not be impeded or endangered in any way.

 

No removal of hedgerows, trees or shrubs which have the potential to support nesting birds shall take place between 1st March and 31st August inclusive, unless a competent ecologist has undertaken a careful, detailed check for active birds' nests immediately before clearance works commence and provided written confirmation that no birds will be harmed and/or that there are appropriate measures in place to protect nesting bird interest on site. Any such written confirmation should be submitted to the local planning authority. As you will be aware all birds, their nests and eggs (except pest species) are protected by the Wildlife and Countryside Act 1981 (and as amended).

 

Date Recommended: 18th June 2018

 

 

 

 

Supporting documents: