Agenda item

Planning Application No. 2018/0045 - Kendon Packaging Ltd Meadow Road, Netherfield.

Minutes:

Outline planning application for up to 40 No. dwellings with all matters reserved except access.

 

Clare Selwood and Michael Rowley, local residents, spoke against the application.

 

Bob Woollard, the applicant’s agent, spoke in support of the application.

 

The Service Manager – Development Services, introduced the report.

 

RESOLVED toGrant Outline Planning Permission with the matter of Access approved: Subject to the applicant entering into a Section 106 Agreement with the Borough Council as Local Planning Authority and with the County Council as Local Education Authority for the provision of, or financial contributions towards, affordable housing, open space, healthcare facilities, education, and a local labour agreement; and subject to the conditions listed for the reasons set out in the report.

 

Conditions

 

1.         Approval of the details of layout, scale parameters, landscaping and appearance (hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority before the commencement of any development.

 

 

2.         Application for the approval of reserved matters must be made not later than three years from the date of the outline permission and the development to which this permission relates must be begun within two years from the date of final approval of reserved matters.

 

 

 

3.         This permission shall be read in accordance with the Site Location Plan and Access Layout Plan, drawing ADC1606-DR-001 Rev P1, and the Flood Risk Assessment, RSE_950-02V1 received by the Local Planning Authority on 16th January 2018.

 

 

4.         Prior to first occupation of the development and with reference to Noise Impact Assessment by Noise Vibration Consultants Ltd (Date: 17th January 2018), verification that the approved sound insulation scheme has been implemented and is fully operational shall be submitted to and be approved in writing by the Local Planning Authority.

 

 

5.         Prior to the commencement of the development a detailed Noise and Dust Management Plan shall be submitted to and be approved in writing by the Local Planning Authority. The noise management part of the plan should make reference to the submitted Noise Impact Assessment by Noise Vibration Consultants Ltd (Date: 17th January 2018).The Noise and Dust Management Plan shall identify the types and locations of works which are likely to cause noise and dust disturbance to sensitive receptors and:- Minimise noise and dust arising from such works by technical and physical means, and through work scheduling & management best practice - Identify (and make stakeholders aware of) the person responsible for recording, investigating & dealing with complaints from residents- Set out a communication strategy to keep regulators, resident and other stakeholders advised well in advance of specific works which are likely to cause noise and dust disturbance- Ensure that as much of the disruptive / noisy / dust generating work as possible is carried out during the normal construction operating hours- Regularly review the Noise and Dust Management Plan. Any amendments which may have an impact on noise or dust sensitive receptors shall be agreed in advance with the regulator and communicated to all other stakeholders. The approved Noise and Dust Management Plan shall be implemented throughout the construction and demolition works undertaken on site.

 

 

6.         Unless otherwise agreed by the Local Planning Authority, development must not commence until the following has been complied with:

 

            Site Characterisation

            An assessment of the nature and extent of any potential contamination has been submitted to and approved in writing by the Local Planning Authority. This assessment must be undertaken by a competent person, and shall assess any contamination on the site, whether or not it originates on the site. Moreover, it must include; a survey of the extent, scale and nature of contamination and; an assessment of the potential risks to: human health, property, adjoining land, controlled waters, ecological systems, archaeological sites and ancient monuments.

 

            Submission of Remediation Scheme.

 

            Where required following the site characterisation assessment, a detailed remediation scheme (to bring the site to a condition suitable for the intended use by removing unacceptable risks to critical receptors) shall be submitted to and approved in writing by the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, an appraisal of remedial options, and proposal of the preferred option(s), and a timetable of works and site management procedures.

 

            In the event that remediation is required to render the development suitable for use, the agreed remediation scheme shall be implemented in accordance with the approved timetable of works.

 

            Prior to occupation of any building(s) a Verification Report (that demonstrates the effectiveness of the remediation carried out) must be submitted and approved in writing by the Local Planning Authority.

 

 

7.         In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority and once the Local Planning Authority has identified the part of the site affected by the unexpected contamination development must be halted on that part of the site. An assessment must be undertaken in accordance with the requirements set out in Condition 6 above, and where remediation is necessary a remediation scheme, together with a timetable for its implementation and verification reporting, must be submitted to and approved in writing by the Local Planning Authority.

 

 

8.         No part of the development hereby permitted shall commence until details of the new road have been submitted to and approved in writing by the Local Planning Authority including longitudinal and cross sectional gradients, street lighting, Traffic Regulation Orders, drainage and outfall proposals, construction specification, provision of and diversion of utilities services, and any proposed structural works. The development shall be implemented in accordance with these details to the satisfaction of the Local Planning Authority

 

 

9.         No part of the development hereby permitted shall be brought into use until all drives and parking areas are surfaced in a bound material (not loose gravel). The surfaced drives and parking areas shall then be maintained in such bound material for the life of the development.

 

 

10.       No part of the development hereby permitted shall be brought into use until the access driveways and parking areas are constructed with provision to prevent the unregulated discharge of surface water from the driveways and parking areas to the public highway. The provision to prevent the unregulated discharge of surface water to the public highway shall then be retained for the life of the development.

 

 

11.       No development hereby permitted shall commence until wheel washing facilities have been installed on the site. The wheel washing facilities shall be maintained in working order at all times during the construction of the development and shall be used by any vehicle carrying mud, dirt or other debris on its wheels before leaving the site so that no mud, dirt or other debris is discharged or carried on to a public road.

 

 

12.       No development shall commence on site in connection with the development thereby approved (including demolition works, tree works, fires, soil moving, temporary access construction and / or widening or any operations involving the use of motorised vehicles or construction machinery) until a detailed Arboricultural Method Statement (AMS) in accordance with BS5837:2012 Trees in relation to design, demolition and construction – Recommendations has been submitted to and approved in writing by the Local Planning Authority and any protective fencing is erected as required by the AMS. The AMS shall include full details of the following:

 

            a) Timing and phasing of Arboricultural works in relation to the approved development.

            b) Details of a tree protection scheme in accordance with BS5837:2012:which provides for the retention and protection of trees, shrubs and hedges adjacent to the site.

            c) Details of any construction works required within the root protection area of trees, hedges or shrubs adjacent to the site, as defined by BS5837:2012.

            d) Details of the arrangements for the implementation, supervision and monitoring of works required to comply with the arboricultural method statement

 

 

13.       Prior to the submission of any reserved matters application, a nocturnal bat emergence or dawn swarming survey and a badger monitoring survey, in accordance with the recommendations set out in the submitted Preliminary Ecological Appraisal and Bat Building Assessment (RSE_950_01_V1) shall be undertaken and submitted to the Local Planning Authority.

 

 

14.       No development shall commence until a surface water drainage scheme for the site, based on sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development, has been submitted to and approved in writing by the Local Planning Authority. The scheme shall subsequently be implemented in accordance with the approved details before the development is completed.

 

 

Reasons

 

1.         To comply with the requirements of Section 92 of the Town and Country Planning Act 1990. The application is expressed to be in outline only in accordance with Article 5 of the Town and Country Planning (Development Management Procedure)(England) Order 2015.

 

2.         To comply with the requirements of Section 92 of the Town and Country Planning Act 1990.

 

3.         To define the permission, for the avoidance of doubt.

 

4.         To protect the amenity of the occupiers of the approved dwellings.

 

5.         To protect the amenities of the occupiers of adjacent dwellings.

 

6.         To ensure that land contamination matters are fully addressed.

 

7.         To ensure that land contamination matters are fully addressed.

 

8.         In the interests of Highway safety.

 

9.         To reduce the possibility of deleterious material being deposited on the public highway (loose stones etc).

 

10.       To ensure surface water from the site is not deposited on the public highway causing dangers to road users.

 

11.       In the interests of Highway safety.

 

12.       To ensure that existing trees on adjacent land are adequately protected.

 

13.       To ensure that ecological interests are adequately protected.

 

14.       To ensure that the surface water drainage scheme is appropriate to meet the needs of the site and the approved development.

 

Reasons for Decision

 

The proposed redevelopment of the site for residential use is considered to be acceptable in principle and it is considered that residential density of up to 40  dwellings could reasonably be achieved. It is not considered that the proposal would cause harm to visual or residential amenity, subject to a detailed consideration at reserved matters stage. The proposal is considered to be acceptable in highway safety terms and is acceptable with respect to ecological, flood risk and heritage matters. It is therefore considered that the proposal meets with the objectives and relevant policies of the National Planning Policy Framework, the Aligned Core Strategy, the Replacement Local Plan and the Emerging Local Plan. 

 

Notes to Applicant

 

It is an offence under S148 and S151 of the Highways Act 1980 to deposit mud on the public highway and as such you should undertake every effort to prevent it occurring.

 

This consent will require approval under Section 19 of the Nottinghamshire County Council Act 1985 and where the new streets are to be adopted an Agreement pursuant to Section 38 of the Highways Act 1980 will be required. Please contact Nottinghamshire County Council to ensure that approvals and agreements are secured before commencement of works.

 

The applicant should note that notwithstanding any planning permission, if any highway forming part of the development is to be adopted by the Highways Authority, the new roads and any highway drainage will be required to comply with the Nottinghamshire County Council's current highway design guidance and specification for roadworks.

 

The Advanced Payments Code in the Highways Act 1980 applies and under section 219 of the Act payment will be required from the owner of the land fronting a private street on which a new building is to be erected.  The developer should contact the Highway Authority with regard to compliance with the Code, or alternatively to the issue of a Section 38 Agreement and bond under the Highways Act 1980.  A Section 38 Agreement can take some time to complete. Therefore, it is recommended that the developer contact the Highway Authority as early as possible.

 

It is strongly recommended that the developer contact the Highway Authority at an early stage to clarify the codes etc. with which compliance will be required in the particular circumstance, and it is essential that design calculations and detailed construction drawings for the proposed works are submitted to and approved by the County Council (or District Council) in writing before any work commences on site.

 

Construction & Demolition Proposed Method of Demolition:

Where the method of proposed demolition includes the use of a mobile crusher on site the applicant must notify the Gedling Borough Council's Environmental Health Team (Tel: 0115 9013972) before crushing operations commence on site, so it may be inspected to ensure it is operating correctly under the Permit conditions imposed by the Pollution and Prevention and Control Act 1999.

 

Noise Control: Hours of Work and Equipment The acceptable hours for demolition or construction work are detailed below; -Monday to Friday: 0730-1800 (noisy operations restricted to 0800-1800)Saturday: 0830-1700 (noisy operations restricted to 0900-1300) Sunday: at no time Bank Holidays: at no time. Work outside these hours may be acceptable in exceptional circumstances but must be agreed in advance with Gedling Borough Council's Environmental Health Team (Tel: 0115 9013972)

 

Equipment: All equipment shall be properly maintained, serviced and operated in accordance with the manufacturer's recommendations and with appropriate noise suppression / silencers. Dust/Grit and Other Fugitive Emissions Construction and demolition work invariably generates grit and dust, which can be carried off-site and cause a Statutory Nuisance, and have a detrimental effect on local air quality. Contractors are expected to use appropriate methods to minimise fugitive emissions, reduce the likelihood of justified complaint and avoid costly restriction and development delays. Appropriate measures include;-Flexible plastic sheeting Water sprays /damping down of spoil and demolition waste Wheel washing. Periodic road cleaning.

 

The applicant's attention is drawn to an informal planning guidance document which has been produced to try and define what sustainable development means in the context of air quality, and how we might help decrease levels by incorporating mitigation measures into scheme design as standard.(Seehttp://www.gedling.gov.uk/resident/planningandbuildingcontrol/planningpolicy/adoptedlocalplanand policydocuments/supplementaryplanningdocumentsandguidance/)We would also ask therefore, that the developer considers the commitment to incorporate provision for an EV (electric vehicle) charging point(s); to allow workers and customers to charge electric/plug-in hybrid vehicles whilst on site. Reference can be made to guidance produced by IET Code of Practice for EV Charging Equipment Installation for details of charging points and plugs specifications.

 

The comments of the Local Lead Flood Authority are attached.

 

The comments of Network Rail are attached.

 

The comments of the Environment Agency with regard to finished floor levels and flood resilience measures are attached.

 

The applicant is advised that all planning permissions granted on or after 16th October 2015  may be subject to the Community Infrastructure Levy (CIL). Full details of CIL are available on the Council's website. The proposed development has been assessed and it is the Council's view that CIL is not payable on the development hereby approved as the development type proposed is zero rated in this location.

 

 

 

 

 

 

 

 

 