Agenda item

Application No. 2016/1033- 2 Sandford Road, Mapperley, Nottinghamshire, NG3 6AL.

Minutes:

Demolition of Existing Dwellings at 2 and 2A Sandford Road and Erection of Building to Provide 10no.Dwellings with Associated Access, Parking and Rear Amenity Space. Renewal of Planning Permission Ref: 2010/0936.

 

The Service Manager, Development Services, introduced the application informing Members that plans mirror those submitted with the original application for planning permission, which had recently expired.

 

RESOLVED toGRANT PLANNING PERMISSION subject to the applicant entering into a Section 106 Agreement with the County Council for a contribution towards primary education and subject to the following conditions:

 

Conditions

 

1.         The development must be begun not later than three years beginning with the date of this permission.

 

2.         The development hereby permitted, other than the means of enclosure of the site and the details of new tree planting adjacent to the boundary with Porchester Road shown on the submitted plans, shall be constructed and implemented in accordance with the following approved plans and documents: Location Plan and Block Plans (0001 Rev A), Proposed Lower Ground Plan (0003 Rev D), Proposed Ground Plan (0004 Rev C), Proposed First Floor Plan (0005 Rev B), Proposed Second Floor Plan (0006 Rev A), Proposed South and East Elevations (0009 Rev C), Proposed Section 1-1 (0010 Rev C), Section BB (0011 Rev B) and Visibility Splay Plan (2000 Rev A), received on 26th September 2016; and Proposed West, North & South Rear Elevations (0008 Rev B), received on 5th January 2017.

 

3.         Before development is commenced a sample of the materials to be used in the external elevations of the building, including to the exterior wall of the proposed vehicular access ramp, shall be submitted to and approved in writing by the Borough Council.  Thereafter the development shall be carried out in accordance with approved materials, unless otherwise prior agreed in writing by the Borough Council.

 

4.         Before development is commenced precise details of the materials to be used in the surfacing of external areas outside of the building, including anti-skid surfacing to the proposed ramp, shall be submitted to and approved in writing by the Borough Council.  The development shall be constructed in accordance with the approved details, which shall be retained for the lifetime of the development, unless otherwise prior agreed in writing by the Borough Council.

 

5.         The development hereby permitted shall not commence until drainage plans for the disposal of surface water (including to the proposed car park and vehicular access ramp) and the disposal of foul sewage from the site and buildings/structures have been submitted to and approved by the Borough Council.  The development shall be constructed in accordance with the approved details, which shall be retained for the lifetime of the development, unless otherwise prior agreed in writing by the Borough Council.

 

6.         Before development commences a method statement setting out measures to ensure the safe removal of the trees to the boundary with Porchester Road shall be submitted to and approved in writing by the Borough Council.  The development shall be implemented in accordance with the approved details, unless otherwise prior agreed in writing by the Borough Council.

 

7.         Before development is commenced, and notwithstanding the details of enclosure shown on the approved plans, there shall be submitted to and approved by the Borough Council precise details of the means of enclosure to the site, including any works to the hedge to the boundary with 7 Hilton Road.  The development shall be constructed in accordance with the approved details, which shall be retained for the lifetime of the development, unless otherwise prior agreed in writing by the Borough Council.

 

8.         Before development is commenced there shall be submitted to and approved by the Borough Council a landscape plan of the site showing precise details of retaining structures adjacent to neighbouring boundaries; the position, type and planting size of all trees and shrubs proposed to be planted, including where appropriate details of existing trees to be felled and retained; a schedule indicating how the proposed soft landscaping is to be maintained, which should cover a minimum period of five years; and details of how any invasive plants (such as Japanese Knotweed) are to be removed from the site.  The approved landscape plan shall be carried out in the first planting season following the substantial completion of the development.  If within a period of five years beginning with the date of the planting of any tree or shrub, that tree or shrub, or any tree or shrub that is planted in replacement of it, is removed, uprooted or destroyed or dies, or becomes in the opinion of the Borough Council seriously damaged or defective, another tree or shrub of the same species and size as that originally planted shall be planted at the same place, unless otherwise prior agreed in writing by the Borough Council.

 

9.         Before development commences precise details of internal and external lighting to the proposed car park and access ramp shall be submitted to and approved in writing by the Borough Council.  The internal and external lighting shall be provided in accordance with the approved details before the development is first brought into use and shall be retained for the lifetime of the development, unless otherwise prior agreed in writing by the Borough Council.

 

10.       Before development is commenced, details of an access ramp with balustrade to facilitate pedestrian access onto Porchester Road shall be submitted to and approved in writing by the Borough Council.  The development shall be constructed in accordance with the approved details, which shall be retained for the lifetime of the development, unless otherwise prior agreed in writing by the Borough Council.

 

11.       Before development is commenced precise details of the proposed access gates, which shall be electronic and shall open into the site, together with details of CCTV to monitor access and egress, shall be submitted to and approved in writing by the Borough Council.  The approved details shall be installed prior to the occupation of the first dwelling, and shall be retained for the lifetime of the development, unless otherwise prior agreed in writing by the Borough Council.

 

12.       Before development is commenced there shall be submitted to and approved in writing by the Borough Council a Preliminary Ecological Appraisal of the site, including any recommended mitigation measures.  Any mitigation measures shall be implemented in accordance with the approved details.

 

13.       The works to trees on the site shall take place outside the bat activity and bird nesting season (March to October inclusive), unless pre-commencement checks for bats and nesting birds have been undertaken by an appropriately qualified ecologist and the outcome reported to the Borough Council.  If any bats or nesting birds are found to be present, details of any proposed mitigation measures shall be submitted to and approved in writing by the Borough Council before the development commences. The mitigation measures shall be implemented in accordance with the approved details before development commences, unless otherwise prior agreed in writing by the Borough Council.

 

 

14.       Before development is commenced, there shall be submitted to and approved in writing by the Borough Council details of a scheme for the provision of bird boxes on or within the fabric of a proportion of the houses; bird boxes should target species such as house sparrow and swallow.  The scheme shall be implemented in accordance with the approved details before the development is first brought into use, unless otherwise prior agreed in writing by the Borough Council, and shall be retained for the lifetime of the development.

 

15.       Before development commences precise details of salt and grit boxes to be provided as part of the development, and the proposed location of these features, shall be submitted to and approved in writing by the Borough Council.  The salt and grit boxes shall be provided in accordance with the approved details prior to the first occupation of the development hereby approved and shall be retained thereafter in accordance with the approved details for the lifetime of the development.

 

16.       Before development is commenced there shall be submitted to and approved in writing by the Borough Council details of a Local Labour Agreement to cover the construction of the development hereby permitted.  The Local Labour Agreement shall be implemented in accordance with the approved details, unless otherwise prior agreed in writing by the Borough Council.

 

17.       No part of the development hereby permitted shall be first occupied until details of a dropped vehicular footway crossing have been submitted to and approved in writing by the Borough Council.  The dropped vehicular footway crossing shall be constructed in accordance with the approved details before the development hereby permitted is first occupied and shall be retained for the lifetime of the development, unless otherwise prior agreed in writing by the Borough Council.

 

18.       No part of the development hereby permitted shall be first occupied until details of the proposed means of closure of the existing site access on Sandford Road and re-instatement of the access crossing as footway with full height kerbs have been submitted to and approved in writing by the Borough Council.  The existing site access shall be permanently closed and the access crossing reinstated as footway in accordance with the approved details before the development hereby permitted is first occupied and shall be retained as approved for the lifetime of the development, unless otherwise prior agreed in writing by the Borough Council.

 

19.       No part of the development hereby permitted shall be brought into use until the visibility splays of 2.4 metres by 43 metres in both directions, as shown on drawing no: 0004 Rev C, are provided.  The area within the visibility splays referred to in this condition shall thereafter be kept free of any obstructions exceeding 600 millimetres in height for the lifetime of the development.

 

20.       No part of the development hereby permitted shall be brought into use until the access to the car parking areas are surfaced in a hard bound material (not loose gravel).  The surfaced drives and any parking or turning areas shall thereafter be maintained in such hard bound material for the lifetime of the development.

 

21.       No part of the development hereby permitted shall be brought into use until the access is constructed with a gradient not exceeding 1 in 20 for a distance of 5 metres from the rear of the highway boundary, and never exceeding 1:12 thereafter, as shown on drawing no: 0004 Rev C.

 

 

22.       No part of the development hereby permitted shall be brought into use until the motorcycle and cycle parking facilities, as indicated on drawing no: 0003 Rev D, have been provided.  The motorcycle and cycle parking facilities shall not thereafter be used for any purpose other than the parking of motorcycles and cycles.

 

23.       No part of the development hereby permitted shall be brought into use until the car parking area has been surfaced and drained, and the individual parking spaces have been clearly marked out, as indicated on drawing no: 0003 Rev D.  The spaces shall be kept available for unallocated parking in association with the development thereafter.  The car parking area shall not thereafter be used for any purpose other than the parking of motorcycles and cycles.

 

Reasons

 

1.         In order to comply with Section 51 of the Planning and Compulsory Purchase Act 2004.

 

2.         For the avoidance of doubt and to allow a proportionate approach to minor material amendments.

 

3.         To ensure that the materials to be used in the external elevations of the proposed building are satisfactory, in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

4.         To ensure that the means of surfacing of the development, and in particular the ramp (which should have a rough surface), are satisfactory and to ensure a satisfactory development, in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

5.         To ensure that the development is provided with a satisfactory means of drainage, and to reduce the risk of creating or exacerbating a flooding problem and to minimise the risk of pollution, in accordance with the aims of Section 10 of the National Planning Policy Framework, Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014) and Policy 1 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

6.         In the interests of public safety and to ensure the structural stability of the adjoining highway is retained, in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

7.         To ensure a satisfactory means of enclosure of the site, in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

8.         To ensure that the landscaping of the proposed development accords with Policy 10 of the Aligned Core Strategy for Gedling Borough (September 2014) and Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

9.         In order to protect neighbouring amenity and ensure the details of the development are satisfactory, in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

10.       In order to ensure the details of the development are satisfactory, in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

11.       In the interests of crime prevention and in order to ensure the details of the development are satisfactory, in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

12.       To minimise any potential impacts on biodiversity in accordance with Section 11 of the National Planning Policy Framework and Policy 17 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

13.       To minimise any potential impacts on biodiversity in accordance with Section 11 of the National Planning Policy Framework and Policy 17 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

14.       In order to compensate for the loss of trees and shrubs to be removed and to enhance biodiversity, in accordance with Section 11 of the National Planning Policy Framework and Policy 17 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

15.       In the interests of highway safety, in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

16.       To seek to ensure that the construction of the site provides appropriate employment and training opportunities, in accordance with Policy 4 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

17.       In the interests of highway safety in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

18.       In the interests of pedestrian and highway safety, in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

19.       In the interests of pedestrian and highway safety, in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

20.       To reduce the possibility of deleterious material being deposited on the public highway, in the interests of pedestrian and highway safety and in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

21.       In the interests of pedestrian and highway safety, in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

22.       To promote a sustainable development, in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

23.       To ensure in the interests of highway safety that there is adequate off-street parking provision to reduce the possibilities of the proposed development leading to on-street parking in the area, in accordance with the aims of Policy ENV1 of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014).

 

Notes to Applicant

 

The applicant is advised that all planning permissions granted on or after 16th October 2015 may be subject to the Community Infrastructure Levy (CIL). Full details of CIL are available on the Council's website. The proposed development has been assessed and it is the Council's view that CIL IS PAYABLE on the development hereby approved as is detailed below.  Full details about the CIL Charge including, amount and process for payment will be set out in the Regulation 65 Liability Notice which will be sent to you as soon as possible after this decision notice has been issued.  If the development hereby approved is for a self-build dwelling, residential extension or residential annex you may be able to apply for relief from CIL.  Further details about CIL are available on the Council's website or from the Planning Portal: www.planningportal.gov.uk/planning/applications/howtoapply/whattosubmit/cil

 

The proposal makes it necessary to construct a vehicular crossing and re-instatement of redundant crossing over a footway of the public highway.  These works shall be constructed to the satisfaction of the Highway Authority.  You are, therefore, required to contact the County Council's Customer Services on 0300 500 80 80, in order to arrange for these works to be carried out.

 

The applicant's attention is drawn to an informal planning guidance document which has been produced to try and define what sustainable development means in the context of air quality, and how the Borough Council might help decrease levels by incorporating mitigation measures into scheme design as standard.(See: http://www.gedling.gov.uk/planningbuildingcontrol/planningpolicy/emerginglocalplan/supplementaryplanningdocuments/ )The Borough Council would also ask that the developer considers the commitment to incorporate provision for an EV (electric vehicle) charging point(s); to allow employees and/or clients/visitors to charge electric/plug-in hybrid vehicles whilst on site. Reference can be made to guidance produced by IET Code of Practice for EV Charging Equipment Installation for details of charging points and plugs specifications.

 

The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to The Coal Authority on 0845 762   6848. Further information is also available on The Coal Authority website at www.coal.decc.gov.uk.Property specific summary information on past, current and future coal mining activity can be obtained from The Coal Authority's Property Search Service on 0845 762 6848 or at www.groundstability.com.

 

The Borough Council has worked positively and proactively with the applicant, in accordance with paragraphs 186 and 187 of the National Planning Policy Framework, based on seeking solutions to problems arising in relation to dealing with the planning application.  This has been achieved by providing details of issues raised in consultation responses; requesting clarification and additional information in response to issues raised and providing updates on the application's progress.

 

Supporting documents: