Agenda item

Application No. 2016/0334- Garage Site 1, Bestwood Lodge Drive, Arnold, Nottinghamshire.

Minutes:

Demolition of existing garages and construction of 4 No 1 Bed apartments and associated external works.

 

John Marshall, a neighbouring resident, spoke in objection to the development.

 

RESOLVED:

 

To grant planning permission subject to the following conditions:

 

1.         The development must be begun not later than three years beginning with the date of this permission.

 

2.         The development hereby approved shall be built in accordance with the the application form and Design Statement, received on 10th March 2016, Arboricultural Survey and Assessment and Extended Phase 1 Habitat Survey and Preliminary Protected Species Survey received on 15th June 2016, and revised plans, drawing no's SK20.007 rev F received on 14th July 2016 and SK90.007 rev K received on 21st July 2016.

 

3.         In the event that contamination is found at any time when carrying out the approved development it must be reported in writing immediately to the Borough Council and once the Borough Council has identified the part of the site affected by the unexpected contamination development must be halted on that part of the site. An assessment must be undertaken in accordance with the requirements of the Borough Council, and where remediation is necessary a remediation scheme, together with a timetable for its implementation and verification reporting, must be submitted to and approved in writing by the Borough Council.

 

4.         The development hereby permitted shall not commence until drainage plans for the disposal of surface water and foul sewage have been submitted to and approved in writing by the Borough Council. Once approved the scheme shall be implemented in accordance with the approved details before the development is first brought into use.

 

5.         Before development is commenced there shall be submitted to and approved in writing by the Borough Council a landscape plan of the site showing the position, type and planting size of all trees and shrubs proposed to be planted. The landscape scheme shall include only native species of local provenance and ornamental species that attract wildlife as recommended in section 6.3.2 of the Ecology Survey. The recommended bird boxes presented in section 6.4.1 of the Ecology Survey shall be integrated in the landscape scheme. Once approved, the landscape scheme shall be carried out in the first planting season following the substantial completion of the development and any planting material which becomes diseased or dies within five years of the completion of the development shall be replaced in the next planting season by the applicants or their successors in title.

 

6.         No part of the development hereby permitted shall be brought into use until the visibility splays of 2.4 x 43m are provided from the proposed access. The area within the visibility splays referred to in this condition shall thereafter be kept free of all obstructions, structures or erections exceeding 0.6metres in height for the life of the development.

 

7.         No part of the development hereby permitted shall be brought into use until a dropped vehicular footway crossing is available for the new access point and is constructed in accordance with the Highway Authority specification to the satisfaction of the Borough Council.

 

8.         The dwellings shall not be occupied/brought into use until all drives and any parking or turning areas are surfaced in a hard bound material (not loose gravel) for a minimum of 5.5 metres behind the Highway boundary. The surfaced drives and any parking or turning areas shall then be maintained in such hard bound material for the life of the development.

 

9.         The dwellings shall not be occupied/brought into use until the access driveway / parking / turning area (s) are constructed with provision to prevent the unregulated discharge of surface water from the driveway/parking/turning area(s) to the public highway in accordance with details first submitted to and approved in writing by the Borough Council. The provision to prevent the unregulated discharge of surface water to the public highway shall then be retained for the life of the development.

 

Reasons

 

1.         In order to comply with Section 51 of the Planning and Compulsory            Purchase Act 2004.

 

2.         For the avoidance of doubt.

 

3.         The site may be contaminated due to previous activities on site.

 

4.         To ensure that the development is provided with satisfactory means of drainage as well as to reduce the risk of creating or exacerbating a flooding problem and to minimise the risk of pollution.

 

5.         To ensure satisfactory development, in accordance with the aims of policy ENV1 of the Gedling Borough Council Replacement Local Plan (Certain Policies Saved 2014).

 

6.         In the interests of Highway safety.

 

7.         In the interests of Highway safety.

 

8.         To reduce the possibility of deleterious material being deposited on the public highway (loose stones etc.).

 

9.         To ensure surface water from the site is not deposited on the public highway causing dangers to road users.

 

Reasons for Decision

 

In the opinion of the Borough Council the principle of the residential development is acceptable, it results in no significant undue impact on the amenity of neighbouring properties or the wider area. The proposed development would be visually acceptable in the streetscene and it is in keeping scale and character with area and the wider locality. The proposal therefore accords with the National Planning Policy Framework (2012), Policies 8 (Housing Size, Mix and Choice) and 10 (Design and enhancing Local Identity) of the Aligned Core Strategy (September 2014), policies ENV1 (Development Criteria) and H7 (Residential Development on Unidentified Sites within the Urban Area and the Defined Village Envelopes) of the Gedling Borough Replacement Local Plan (Certain Policies Saved 2014) and the Supplementary Planning Document "Parking Provision for Residential Developments" (May 2012).

 

Notes to Applicant

 

Positive and Proactive Statement - The Borough Council has worked positively and proactively with the applicant in accordance with paragraphs 186 to 187 of the National Planning Policy Framework. Negotiations have taken place during the consideration of the application to address adverse impacts identified by officers in connection with the proposal, addressing the identified adverse impacts, thereby resulting in a more acceptable scheme and a favourable recommendation.

 

The applicant is advised that all planning permissions granted on or after 16th October 2015 may be subject to the Community Infrastructure Levy (CIL). Full details of CIL are available on the Council's website. The proposed development has been assessed and it is the Council's view that CIL is not payable on the development hereby approved as the development type proposed is zero rated in this location.

 

The applicants attention is drawn to an informal planning guidance document which has been produced to try and define what sustainable development means in the context of air quality, and how we might help decrease levels by incorporating mitigation measures into scheme design as standard. (Seehttp://www.gedling.gov.uk/planningbuildingcontrol/planningpolicy/emerginglocalplan/supplementaryplanningdocuments/) We would also ask therefore, that the developer considers the commitment to incorporate provision for an EV (electric vehicle) charging point(s); to allow employees and/or clients/visitors to charge electric/plug-in hybrid vehicles whilst on site. Reference can be made to guidance produced by IET Code of Practice for EV Charging Equipment Installation for details of charging points and plugs specifications.

 

You must contact the Borough Council's Building Control Section with regard to any proposed demolition of buildings on the site at least 4 weeks prior to any site clearance commencing.

 

Demolition works should not be undertaken during the bird breeding season (1st March to the 31st August inclusive).  If this cannot be avoided, an ecologist will need to search for active bird nests immediately prior to works commencing.

 

The attached permission is for development which will involve building up to, or close to, the boundary of the site.  Your attention is drawn to the fact that if you should need access to neighbouring land in another ownership in order to facilitate the construction of the building and its future maintenance you are advised to obtain permission from the owner of the land for such access before beginning your development.

 

Severn Trent Water advises that there is a public sewer located within the application site. Public sewers have statutory protection by virtue of the Water Industry Act 1991 as amended by the Water Act 2003 and you may not build close to, directly over or divert a public sewer without consent. You are advised to contact Severn Trent Water to discuss your proposals. Severn Trent Water will seek to assist you in obtaining a solution which protects both the public sewer and the proposed development.

 

The proposal makes it necessary to construct a vehicular crossing over a footway of the public highway. These works shall be constructed to the satisfaction of the Highway Authority. You are, therefore, required to contact the County Council's Customer Services to arrange for these works on telephone 0300 500 80 80.to arrange for these works to be carried out.

 

The proposal makes it necessary to relocate a lighting column on the footway. These works shall be constructed to the satisfaction of the Highway Authority. You are, therefore, required to contact the County Council's Customer Services to arrange for these works on telephone 0300 500 80 80.to arrange for these works to be carried out.

 

The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to The Coal Authority on 0845 762   6848. Further information is also available on The Coal Authority website at www.coal.decc.gov.uk.Property specific summary information on past, current and future coal mining activity can be obtained from The Coal Authority's Property Search Service on 0845 762 6848 or at www.groundstability.com.

Supporting documents: