Agenda item

Application No. 2020/0726 - Land On Flatts Lane, Calverton

Minutes:

Variation of conditions 8 (trees) 3, 16 and 17 (highways) of outline permission 2018/1143 - for the demolition of existing buildings and structures and the erection of up to 84 no. dwellings and associated open space and infrastructure.

 

Sally Smith -Senior Planning Manager of Bellway Homes (The Applicant) spoke in support of the application.

 

The Principal Planning Officer introduced the report.

 

RESOLVED:

 

To Grant Outline Planning Permission with the matter of Access approved: Subject to the parties to original section 106 confirming in writing that the development permitted is similar to the development permitted by the original planning permission and subject to the conditions listed for the reasons set out in the report.

 

 

Conditions

 

1. Approval of the details of layout, scale, landscaping and appearance (hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority before the commencement of any development.

 

2. Application for the approval of reserved matters must be made not later than the 5h March 2023 and the development to which this permission relates must be begun within two years from the date of final approval of reserved matters.

 

3. This permission shall be read in accordance with drawing number 10_01 revision 00 (with regard to the site area only) and drawing number S0000/100/01 Rev A (with regard to the four access points onto Flatts Lane only).  Development shall thereafter be undertaken in accordance with these plans.

 

4. Prior to the commencement of development details of the existing and proposed ground levels of the site and finished floor levels of the dwellings shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be undertaken in accordance with the approved details.

 

5. Development shall not commence until a scheme for the satisfactory disposal of foul and surface water from the site has been submitted to, and approved in writing by, the Local Planning Authority. No part of the development shall then be occupied or brought into use until the approved foul and surface water drainage works are completed in accordance with the approved scheme.

 

6. Unless otherwise agreed by the Local Planning Authority, development must not commence until the following has been complied with:

 

Site Characterisation

An assessment of the nature and extent of any potential contamination has been submitted to and approved in writing by the Local Planning Authority. This assessment must be undertaken by a competent person, and shall assess any contamination on the site, whether or not it originates on the site. Moreover, it must include; a survey of the extent, scale and nature of contamination and; an assessment of the potential risks to: human health, property, adjoining land, controlled waters, ecological systems, archaeological sites and ancient monuments.

 

Submission of Remediation Scheme Where required following the site characterisation assessment, a detailed remediation scheme (to bring the site to a condition suitable for the intended use by removing unacceptable risks to critical receptors) shall be submitted to and approved in writing by the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, an appraisal of remedial options, and proposal of the preferred option(s), and a timetable of works and site management procedures.

In the event that remediation is required to render the development suitable for use, the agreed remediation scheme shall be implemented in accordance with the approved timetable of works.

 

Prior to occupation of any building(s) a Verification Report (that demonstrates the effectiveness of the remediation carried out) must be submitted and approved in writing by the Local Planning Authority.

 

7. In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority and once the Local Planning Authority has identified the part of the site affected by the unexpected contamination development must be halted on that part of the site. An assessment must be undertaken in accordance with the requirements set out in Condition 6 above, and where remediation is necessary a remediation scheme, together with a timetable for its implementation and verification reporting, must be submitted to and approved in writing by the Local Planning Authority. Any remediation works and verification reports shall be undertaken in accordance with the approved remediation scheme.

 

8. The development shall be carried out in accordance with the findings of the Arboricultural Assessment produced by FPC ref 9143AA.

No development shall however commence on site in connection with the development hereby approved (including, tree works, fires, soil moving, temporary access construction and / or widening or any operations involving the use of motorised vehicles or construction machinery) until a detailed Arboricultural Method Statement (AMS) in accordance with BS5837:2012 Trees in relation to design, demolition and construction) Recommendations has been submitted to and approved in writing by the Local Planning Authority and any protective fencing is erected as required by the AMS. The AMS shall include full details of the following:

a) Timing and phasing of Arboricultural works in relation to the approved development.

b) Details of any construction works required within the root protection area of trees, hedges or shrubs on and adjacent to the site, as defined by BS5837:2012.

c) Details of the arrangements for the implementation, supervision and monitoring of works required to comply with the arboricultural method statement.

The development shall thereafter be undertaken in accordance with the approved Arboricultural Method Statement.

 

9. Prior to commencement of any above ground construction works, details of Electric Vehicle charging points to be provided at each dwelling, to include their location and specification shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be undertaken in accordance with the approved details prior to the first occupation of the development.

 

10. Prior to the commencement of the development a detailed Noise and Dust Management Plan shall be submitted to and be approved in writing by the Local Planning Authority. The Noise and Dust Management Plan shall identify the types and locations of works which are likely to cause noise and dust disturbance to sensitive receptors and: -Minimise noise and dust arising from such works by technical and physical means, and through work scheduling & management best practice - Identify (and make stakeholders aware of) the person responsible for recording, investigating & dealing with complaints from residents - Set out a communication strategy to keep regulators, resident and other stakeholders advised well in advance of specific works which are likely to cause noise and dust disturbance - Ensure that as much of the disruptive / noisy / dust generating work as possible is carried out during the normal construction operating hours - Regularly review the Noise and Dust Management Plan. Any amendments which may have an impact on noise or dust sensitive receptors shall be agreed in advance with the Local Planning Authority and communicated to all other stakeholders. The approved Noise and Dust Management Plan shall be implemented throughout the construction and demolition works undertaken on site.

 

11. The development shall be undertaken in accordance with the recommendations set out in Section 5 of the submitted Ecological Assessment Report (Document Ref 6710.002) dated October 2018.

 

12. Prior to the erection of any external lighting (other than within the curtilages of the approved dwellings) there shall be submitted to and approved in writing by the Local Planning Authority details of all such lighting, including levels of illumination and a lux plot of the estimated luminance. Any lighting to be installed along the site boundaries should be kept to a minimum and directed away from the building and retained boundary features to maintain 'dark' areas and corridors. The external lighting shall be provided in accordance with the approved details and shall be retained as such thereafter for the lifetime of the development.

 

13. No above ground construction works shall commence until details of bat and bird boxes to be incorporated within the fabric of the buildings and/or within the site have been submitted to and approved in writing by the Local Planning Authority. The bat and bird boxes shall thereafter be provided in accordance with the approved details prior to the first occupation of the development hereby approved.

 

14. a) No development shall take place until a Written Scheme of Investigation for archaeological work has been submitted to and approved in writing by the Local Planning Authority, and until all pre-start elements of the approved scheme have been completed to the satisfaction of the Local Planning Authority. The scheme shall include an assessment of significance and research questions; and: i) The programme and methodology of site investigation and recording ii) The programme for post investigation assessment iii) Provision to be made for analysis of the site investigation and recording iv) Provision to be made for publication and dissemination of the analysis and records of the site investigation v) Provision to be made for the archive deposition of the analysis and records of the site investigation vi) Nomination of a competent person or persons/organisation to undertake the works set out within the Written Scheme of Investigation b) The development shall not take place other than in accordance with the Written Scheme of Investigation for archaeological work approved under part a). c) The new dwellings shall not be brought into use until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation for archaeological work approved under part a) and the provision to be made for analysis, publication and dissemination of results has been secured.

 

15. No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to, and approved in writing by the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide for: i) the parking of vehicles of site operatives and visitors ii) loading and unloading of plant and materials iii) storage of plant and materials used in constructing the development

iv) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate v) wheel washing facilities vi) measures to control the emission of dust and dirt during construction vii) a scheme for recycling/disposing of waste resulting from demolition and construction works

 

16. The reserved matters application for the development hereby permitted shall include detailed plans and particulars relating to the following items: (i) A detailed layout plan of the site (for the avoidance of doubt the submitted layout plans reference S0000/100/01 Rev A, shall be considered to be for indicate purposes only) which shall be accompanied by a swept path analysis of an 11.5m long refuse vehicle throughout the proposed highway to become adopted, considering the likelihood of on street parking; (ii) Bin storage location at shared private drives.

 

17. Prior to first occupation of the development hereby approved, construction details of the four vehicular site access junctions from Flatts Lane shall be submitted to and approved in writing by the Local Planning Authority. The approved detailed access arrangements shall thereafter be implemented prior to first occupation of the development.

 

18. Prior to first occupation of the development hereby approved details of the two uncontrolled pedestrian crossings, across Flatts Lane, including dropped kerbs and tactile paving, as illustratively shown on drawing reference: "METM300301/Revision 1" shall be submitted to and approved in writing by the Local Planning Authority. The crossings shall be provided in accordance with the approved details prior to first occupation of the development hereby approved.

 

19. Prior to first occupation of the development hereby approved construction details of the proposed 2.0m wide footway on the western side of Flatts Lane along the sites frontage, as illustratively shown in outline on plan titled: "METM3003-01/Revision 1", shall be submitted to and approved in writing by the Local Planning Authority. The approved footway arrangement and associated works shall thereafter be implemented prior to first occupation of the development hereby approved.

 

20. Occupation of the proposed dwellings shall not take place until their respective driveways have been surfaced in a bound material (not loose gravel) for a minimum distance of 5.0 metres behind the highway boundary, and which shall be drained to prevent the discharge of surface water from the driveway to the public highway. The bound material and the provision to prevent the discharge of surface water to the public highway shall be retained for the lifetime of the development.

 

Reasons

1. To comply with the requirements of Section 92 of the Town and Country Planning Act 1990. The application is expressed to be in outline only in accordance with Article 5 of the Town and Country Planning (Development Management Procedure)(England) Order 2015.

 

2. To comply with the requirements of Section 92 of the Town and Country Planning Act 1990.

 

3. To define the permission, for the avoidance of doubt.

 

4. To ensure that the development does not have a detrimental impact upon visual amenity or upon the occupiers of adjacent dwellings.

 

5. To ensure that the drainage scheme is appropriate to meet the needs of the site and the approved development.

 

6. To ensure the development is safe and suitable for use, thereby taking into consideration paragraph 178 of the National Planning Policy Framework and policy LPD7 of the Councils Local Plan.

 

7. To ensure the development is safe and suitable for use, thereby taking into consideration paragraph 178 of the National Planning Policy Framework and policy LPD7 of the Councils Local Plan.

 

8. To ensure that existing trees and hedges are adequately protected.

 

9. To ensure the development is constructed in an appropriate sustainable manner which takes into consideration air quality with in the Borough, and takes into consideration policy LPD11 of the Councils Local Plan.

 

10. To ensure the development is constructed in an appropriate sustainable manner which takes into consideration air quality with in the Borough, and takes into consideration the National Planning Policy Framework and policy LPD11 of the Councils Local Plan and in the interests of residential amenity.

 

11. In the interests of protecting ecological interests

 

12. In the interests of protecting ecological interests.

 

13. In the interests of enhancing ecological provision on the site.

 

14. To safeguard any potential archaeological remains.

 

15. In the interest of highway safety.

 

16. To ensure the development is designed and constructed to adoptable standards and appropriately maintained.

 

17. In the interest of Highway Safety, to ensure adequate access, operational capacity, and associated visibility is provided to the development, along with safe pedestrian access.

 

18. In the interest of sustainable travel.

 

19. In the interest of sustainable travel.

 

20. In the interests of highway safety.

 

 

 

 