Agenda item

Application No. 2020/0009 - Millbeck House, Oakdale Road, Arnold

Minutes:

Full planning application for the conversion of a disused/unoccupied residential care home (C2) into 23 apartments (C3) comprising of 16 x 1 beds and 7 x 2 beds.

 

RESOLVED:

 

That the Borough Council GRANTS PLANNING PERMISSION, subject to the owner entering into planning obligations with the Borough Council as local planning authority to a review of viability of the development at Millbeck House and to secure a local labour agreement and with the County Council as local highway authority for the provision of, or financial contributions towards bus stop infrastructure at Cedar Grove and subject to the following conditions:

 

Conditions

 

 1         The development must be begun not later than three years beginning with the date of this permission.

 

 2         The development hereby permitted shall be completed in accordance with the submitted documents received on the 7th January 2020- the Application Form; and Design and Access Statement and the following plans received on the 7th January 2020:Existing Ground Floor Plan drg. no. MH-HD-1001-P00-PLExisting First Floor Plan drg. no. MH-HD-1002-P00-PLExisting Roof Plan drg. no. MH-HD-1003-P00-PLExisting Elevations drg. no. MH-HD-1004-P00-PLProposed Ground Floor Plan drg. no. MH-HD-2001-P00-PLProposed First Floor Plan drg. no. MH-HD-2002-P00-PLProposed Roof Plan drg. no. MH-HD-2003-P00-PLProposed Elevations drg. no. MH-HD-2004-P00-PL.

 

The development hereby permitted shall thereafter be undertaken in accordance with the submitted plans and details.

 

 3         The materials used in any exterior work shall be as identified on the approved drg no. MH-HD-2004-P00-PL and Section 7 of the application form submitted on the 7th January 2020.

 

 4         No part of the development hereby permitted shall be brought into use until the parking, turning and servicing areas are surfaced in a bound material with the parking bays clearly delineated in accordance with the plan figure 15. Proposed ground floor plan (Within Design and Access Statement). The parking, turning and servicing areas shall be maintained in the bound material for the life of the development and shall not be used for any purpose other than the parking, turning and loading and unloading of vehicles.

 

 5         Prior to the first occupation of the development hereby approved details of the soft and hard landscape works shall be submitted to and approved in writing by the Local Planning Authority. The detailed landscape plans and particulars shall include details of size, species, positions and densities of all trees, hedges and shrubs to be planted together with a programme of implementation. The development shall be implemented in accordance with the approved details.

 

 6         If within a period of five years beginning with the date of the planting of any tree or shrub, approved in relation to conditon 5 of this permission, that tree or shrub, or any tree or shrub that is planted in replacement of it, is removed, uprooted or destroyed or dies, or becomes in the opinion of the Local Planning Authority seriously damaged or defective, another tree or shrub of the same species and size as that originally planted shall be planted at the same place.

 

 7         Before the development is commenced a Construction Emission Management Plan (CEMP) for minimising the emission of dust and other emissions to air during the site preparation and construction shall be submitted to and approved in writing by the Local Planning Authority. The CEMP must be prepared with due regard to the guidance produced by the Council on the assessment of dust from demolition and construction and include a site specific dust risk assessment. All works on site shall be undertaken in accordance with the approved CEMP.

 

 8         Prior to the occupation of building(s) hereby permitted, details shall be submitted to and approved in writing by the Local Planning Authority as to the position within the development of two (2) Electric Vehicle Recharging Points. The Electric Vehicle Recharging Points shall be in a prominent position on the site and shall be for the exclusive use of zero emission vehicles. The Electric Vehicle Recharging Points shall be installed prior to occupation of any part of the development and shall be thereafter maintained in the location as approved for the lifetime of the development. All EV charging points shall meet relevant safety and accessibility requirements and be clearly marked with their purpose; which should be drawn to the attention of new residents in their new home welcome pack / travel planning advice.

 

Reasons

 

 1         In order to comply with Section 51 of the Planning and Compulsory Purchase Act 2004.

 

 2         For the avoidance of doubt.

 

 3         In the interests of visual amenity and the character and appearance of the area in accordance with the aims of policy LPD 40 of the Local Planning Document..

 

 4         To ensure that adequate off-street parking provision is made to reduce the possibilities of the proposed development leading to on-street parking in the area.

 

 5         To ensure a satisfactory development in accordance with the aims of Policy 10 of the Aligned Core Strategy and policy LPD 32 of the Local Planning Document.

 

 6         To ensure a satisfactory development in accordance with the aims of Policy 10 of the Aligned Core Strategy and policy LPD 32 of the Local Planning Document.

 

 7         To ensure the development is constructed in an appropriate sustainable manner which takes into consideration air quality within the Borough, and takes into consideration the National Planning Policy Framework and Policy LPD11 of the Council's Local Plan.

 

 8         To ensure the development is constructed in an appropriate sustainable manner which takes into consideration air quality within the Borough, and takes into consideration the National Planning Policy Framework and Policy LPD11 of the Council's Local Plan.

 

Reasons for Decision

 

The development is visually acceptable, results in no undue impact on neighbouring properties or the area in general. There are no highway safety or parking issues arising as part of the proposal. The proposal would not be viable if the required affordable planning obligations are provided however, in the overall planning balance it is considered that this is outweighed by the fact that the development would bring a vacant site back into use, that it would provide residential accommodation in a sustainable location and that it would contribute to the Council's 5 year housing land supply. Taking the above into account, it is considered that the proposal is appropriate for its context and is in accordance with Sections 2, 4, 5, 9, 11 and 12 of the NPPF (2019), Policies A, 1, 2, 8, 10, 18 and 19 of the Aligned Core Strategy (2014) and Policies 32, 33, 35, 37, 40, 57 and 61 the Local Planning Document Part 2 Local Plan (2018).There are no material considerations that indicate otherwise although conditions have been attached

 

Notes to Applicant

 

The applicant is advised that all planning permissions granted on or 16th October 2015 may be subject to the Community Infrastructure Levy (CIL). Full details of CIL are available on the Council's website. The proposed development has been assessed and it is the Council's view that CIL is not payable on the development given that there is no net additional increase of floorspace as a result of the development.

 

The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to The Coal Authority on 0845 762 6848. Further information is also available on The Coal Authority website at www.coal.decc.gov.uk.Property specific summary information on past, current and future coal mining activity can be obtained from The Coal Authority's Property Search Service on 0845 762 6848 or at www.groundstability.com.

 

Planning Statement - The Borough Council has worked positively and proactively with the applicant in accordance with paragraph 38 of the National Planning Policy Framework. During the processing of the application there were no problems for which the Local Planning Authority had to seek a solution in relation to this application.

 

Date Recommended: 2nd June 2020

 

 

Supporting documents: