Application No. 2019/0764 - Land At Chase Farm, Mapperley Plains, Mapperley

Minutes:

Outline planning permission all matters reserved except access for residential development.

 

The Service Manager – Development Services introduced the report.

 

RESOLVED:

 

To Grant Outline Planning Permission with the matter of Access approved: Subject to the applicant entering into a Section 106 Agreement with the Borough Council as Local Planning Authority and with the County Council as Local Education Authority for the provision of, or financial contributions towards, affordable housing, open space, education, primary care, bus stop improvement and a local labour agreement; and subject to the conditions listed for the reasons set out in the report:

 

 

Conditions

 

 1         Application for the approval of reserved matters must be made not later than three years from the date of the outline permission and the development to which this permission relates must be begun within two years from the date of final approval of reserved matters.

 

 2         Approval of the details of layout, scale, landscaping and appearance (hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority before the commencement of any development.

 

 3         This permission shall be read in accordance with the Site Location Plan and Indicative Site Layout (with regards to access only).The development shall thereafter be undertaken in accordance with these plans.

 

 4         Prior to the commencement of development details of the existing and proposed ground levels of the site and finished floor levels of the dwellings shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be undertaken in accordance with the approved details.

 

 5         Development shall not commence until a scheme for the satisfactory disposal of foul and surface water from the site has been submitted to, and approved in writing by, the Local Planning Authority. If a pumped solution is being proposed for this development, a sewer modelling assessment may be required to determine what impact the generated flows from this site will have on the network and to determine the maximum pump rate that could be accommodated within the existing network without worsening the existing sewer performance in rainfall events. No part of the development shall then be occupied or brought into use until the approved foul and surface water drainage works are completed in accordance with the approved scheme

 

 6         Unless otherwise agreed by the Local Planning Authority, development must not commence until the following has been complied with: Site Characterisation An assessment of the nature and extent of any potential contamination has been submitted to and approved in writing by the Local Planning Authority. This assessment must be undertaken by a competent person, and shall assess any contamination on the site, whether or not it originates on the site. Moreover, it must include; a survey of the extent, scale and nature of contamination and; an assessment of the potential risks to: human health, property, adjoining land, controlled waters, ecological systems, archaeological sites and ancient monuments. Submission of Remediation Scheme. Where required following the site characterisation assessment, a detailed remediation scheme (to bring the site to a condition suitable for the intended use by removing unacceptable risks to critical receptors) shall be submitted to and approved in writing by the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, an appraisal of remedial options, and proposal of the preferred option(s), and a timetable of works and site management procedures. In the event that remediation is required to render the development suitable for use, the agreed remediation scheme shall be implemented in accordance with the approved timetable of works. Prior to occupation of any building(s) a Verification Report (that demonstrates the effectiveness of the remediation carried out) must be submitted and approved in writing by the Local Planning Authority.

 

 7         In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority and once the Local Planning Authority has identified the part of the site affected by the unexpected contamination development must be halted on that part of the site. An assessment must be undertaken in accordance with the requirements set out in Condition 6 above, and where remediation is necessary a remediation scheme, together with a timetable for its implementation and verification reporting, must be submitted to and approved in writing by the Local Planning Authority.

 

 8         Prior to commencement of any external works, details of Electric Vehicle charging points to be provided at each dwelling, to include their location and specification shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be undertaken in accordance with the approved details prior to the first occupation of the development.

 

 9         Prior to commencement of the development a Construction Emission Management Plan (CEMP) for minimising the emission of dust and other emissions to air during the site preparation and construction shall be submitted to and approved in writing by the Local Planning Authority. The CEMP must be prepared with due regard to the guidance set out in the IAQM Guidance on the assessment of dust from demolition and construction and include a site specific dust risk assessment. All works on site shall be undertaken in accordance with the approved CEMP unless otherwise agreed in writing by the Local Planning Authority.

 

10        Prior to the erection of any external lighting (other than within the curtilages of the approved dwellings) there shall be submitted to and approved in writing by the Local Planning Authority details of all such lighting, including levels of illumination and a lux plot of the estimated luminance. The external lighting shall be provided in accordance with the approved details and shall be retained as such thereafter for the lifetime of the development.

 

11        No above ground construction works shall commence until details of bat and bird boxes to be incorporated within the fabric of the buildings and/or within the site have been submitted to and approved in writing by the Local Planning Authority. The bat and bird boxes shall thereafter be provided prior to the first occupation of the development hereby approved.

 

12        No dwelling shall be occupied until such time as the Gedling Access Road has been completed and is open to traffic.

 

13        No direct vehicle access shall be taken at any time between the application site and the B684 Mapperley Plains Road.

 

14        Prior to the first occupation of the dwellings hereby approved the highway works (access junction to the GAR) as shown on the plan entitled 'Site Access Arrangements', drawing no. CFGN-BSP-ZZ-XX-DR-D-001, revision P2 shall be provided.

 

15        No dwelling hereby approved shall be occupied until any access driveway or parking area directly relating to that dwelling has been surfaced in a bound material (not loose gravel).  The surfaced driveway or parking area shall then be maintained in such bound material for the life of the development.

 

16        No part of the development hereby permitted shall be brought into use until all access driveways and parking areas are constructed with provision to prevent the unregulated discharge of surface water from the driveways and parking areas to the public highway. The provision to prevent the unregulated discharge of surface water to the public highway shall then be retained for the life of the development

 

17        No development hereby permitted shall commence until details of wheel washing facilities have been submitted to and approved in writing by the Local Planning Authority.  The wheel washing facilities thereby approved shall be maintained in working order for the duration of the construction works at all times and shall be used by any vehicle carrying mud, dirt or other debris on its wheels before leaving the site so that no mud, dirt or other debris is discharged or carried on to a public road.

 

18        The maximum number of residential units to be constructed on site shall be 46.

 

Reasons

 

 1         To comply with the requirements of Section 92 of the Town and Country Planning Act 1990.

 

 2         To comply with the requirements of Section 92 of the Town and Country Planning Act 1990. The application is expressed to be in outline only in accordance with Article 5 of the Town and Country Planning (Development Management Procedure)(England) Order 2015.

 

 3         To define the permission, for the avoidance of doubt.

 

 4         This pre-commencement condition is necessary to ensure that the development does not have a detrimental impact upon visual amenity or upon the occupiers of adjacent dwellings

 

 5         To ensure that satisfactory provision is made at the appropriate time for the disposal of foul and surface water.

 

 6         To ensure the development is safe and suitable for use, thereby taking into consideration paragraph 178 of the National Planning Policy Framework and policy LPD7 of the Councils Local Planning Document.

 

 7         To ensure the development is safe and suitable for use, thereby taking into consideration paragraph 178 of the National Planning Policy Framework and policy LPD7 of the Councils Local Planning Document.

 

 8         In the interest of sustainable travel

 

 9         To ensure the development is constructed in an appropriate sustainable manner which takes into consideration air quality with in the Borough, and takes into consideration policy LPD11 of the Councils Local Planning Document.

 

10        In the interests of protecting ecological interests

 

11        In the interests of enhancing ecological provision on the site.

 

12        In the interest of Highway Safety, to ensure adequate access, operational capacity, and associated visibility is provided to the development

 

13        In the interest of Highway Safety, to ensure adequate access, operational capacity, and associated visibility is provided to the development.

 

14        In the interest of Highway Safety, to ensure adequate access, operational capacity, and associated visibility is provided to the development.

 

15        To ensure appropriate access and parking arrangements are available.

 

16        To ensure appropriate access and parking arrangements are available.

 

17        In the interest of Highway Safety, to ensure adequate access, operational capacity, and associated visibility is provided to the development.

 

18        To define the permission and for the avoidance of doubt

 

Reasons for Decision

 

The principle of the development accords with the objectives of national and local planning policies. It is considered that the site could be used for residential development without causing undue harm to visual and residential amenity, highway safety, ecological interests or flooding. It is therefore considered that the granting of outline planning permission would fully accord with the objectives of the relevant planning policies set out in the National Planning Policy Framework, Aligned Core Strategy, Local Planning Document and Supplementary Planning Documents.

 

Notes to Applicant

 

Notes to Applicant: It is an offence under S148 and S151 of the Highways Act 1980 to deposit mud on the public highway and as such you should undertake every effort to prevent it occurring. The applicant should note that notwithstanding any planning permission if any highway forming part of the development is to be adopted by the Highways Authority, the new roads and any highway drainage will be required to comply with Nottinghamshire County Council's current highway design guidance and specification for roadworks. The Advanced Payments Code in the Highways Act 1980 applies and under section 219 of the Act payment will be required from the owner of the land fronting a private street on which a new building is to be erected.  The developer should contact the Highway Authority with regard to compliance with the Code, or alternatively to the issue of a Section 38 Agreement and bond under the Highways Act 1980.  A Section 38 Agreement can take some time to complete. Therefore, it is recommended that the developer contact the Highway Authority as early as possible. It is strongly recommended that the developer contact the Highway Authority at an early stage to clarify the codes etc. with which compliance will be required in the particular circumstance, and it is essential that design calculations and detailed construction drawings for the proposed works are submitted to and approved by the County Council (or District Council) in writing before any work commences on site. All correspondence with the Highway Authority should be addressed to:- NCC (Highways Development Control) (Floor 3)Nottinghamshire County Council County Hall Loughborough Road West Bridgford Nottingham, NG2 7QP

 

Planning Practice Guidance and section H of the Building Regulations 2010 detail surface water disposal hierarchy. The disposal of surface water by means of soakaways should be considered as the primary method. If this is not practical and there is no watercourse is available as an alternative other sustainable methods should also be explored. If these are found unsuitable, satisfactory evidence will need to be submitted, before a discharge to the public sewerage system is considered. Severn Trent Water advises that there is a public sewer located within the application site. Public sewers have statutory protection by virtue of the Water Industry Act 1991 as amended by the Water Act 2003 and you may not build close to, directly over or divert a public sewer without consent. You are advised to contact Severn Trent Water to discuss your proposals. Severn Trent Water will seek to assist you in obtaining a solution which protects both the public sewer and the proposed development. They may obtain copies of our current guidance notes and application forms for diversions from either our website (www.stwater.co.uk) or by contacting our Developer Services Team (Tel: 0800 707 6600).

 

No vegetation clearance or ground works shall take place on site during the bird nesting season (1st March to 31st August inclusive in any given year), unless pre-commencement checks for nesting birds have been undertaken by an appropriately qualified ecologist.  If any nesting birds are found to be present, details of any proposed mitigation measures shall be submitted to and approved in writing by the Borough Council before the development commences. The mitigation measures shall be implemented in accordance with the approved details before development commences, unless otherwise prior agreed in writing by the Borough Council.

 

The applicant is advised that any site clearance works are undertaken outside of the bird breeding season - October to February inclusive.

 

The applicant is advised that all planning permissions granted on or after 16th October 2015 may be subject to the Community Infrastructure Levy (CIL). Full details of CIL are available on the Council's website. The proposed development has been assessed and it is the Council's view that CIL IS PAYABLE on the development hereby approved. The actual amount of CIL payable will be calculated when a decision is made on the subsequent reserved matters application

 

The applicant attention is drawn to the following advice in relation to the control of non-native plant species. https://www.gov.uk/guidance/prevent-the-spread-of-harmful-invasive-and-non-native-plants

 

The developer is encouraged to consider upgrading the EV charging facilities to incorporate additional mode 3 charging capability as this will help future proof the development and improve its sustainability. A suitable 'IEC 62196' electrical socket (minimum rated output of 3.7kw /16A) can be provided in addition to the standard 3 pin socket to allow 'Mode 3' charging of an electric vehicle. Mode 3 charging, using a suitable cable and charging point, allows Smart charging of electric vehicles. All electrical circuits/installations shall comply with the electrical requirements of BS7671:2008 as well as conform to the IET code of practice on Electrical Vehicle Charging Equipment installation (2015).

 

In relation to the lighting condition above the submission of a bat-sensitive lighting scheme, should be developed in accordance with the Bat Conservation Trust publication "Artificial Lighting and Wildlife - Interim Guidance: recommendations to help minimise the impact of artificial lighting" dated June 2014.

 

 