Agenda item

Application No. 2017/1571 - Development Site Chase Farm Arnold Lane Gedling

Minutes:

Erection of employment units (Class B1c/B2/B8 Use), Pub/Restaurant (Class A3/A4 Use) and Drive Thru (Class A3 Use), together with associated parking, servicing and landscaping.

 

The Service Manager – Development Services introduced the report.

 

RESOLVED:

 

That the Borough Council GRANTS OUTLINE PLANNING PERMISSION with matters relating to Appearance, Landscaping, Scale, and Layout reserved for subsequent approval; subject to the applicant entering into a Section 106 Agreement with the Borough Council as local planning authority and with the County Council as local highway authority for the provision of, or financial contributions towards a Management Company, Integrated Transport Facilities, Translocation of Habitat and a Local Employment Agreement (in accordance with Section 14.0 of the report), and subject to the following conditions:

 

Conditions

 

 1         Approval of the details of Appearance, Landscaping, Layout and Scale (hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority before the commencement of any development.

 

 2         Application for the approval of reserved matters must be made not later than five years from the date of the outline permission and the development to which this permission relates must be begun within two years from the date of final approval of reserved matters.

 

 3         The submission of all reserved matters and the implementation of the development shall be carried out in accordance with the plans and documents received on the 22nd December 2017: -; Extended Phase 1 Habitat Survey; Bat Survey Report; Breeding Bird Surveys; Design and Access Statement (P17-1794_200); Drainage Strategy (P15-157 - 202A); Planning Statement (Dec 2017 - SLR/ST - P17-1794); Overall Proposed Site Plan (14005-102); Overall Proposed Site Plan (14005-103); Existing Location Plan (14005-100); Existing Location Plan (14005-101); Framework Travel Plan (ADC1616-B); Indicative Zoning Plan (14005-105); and Indicative Design Site Section (14005-104) and Amended Application Forms received on 11th June 2019.

 

 4         No part of the development hereby permitted shall be occupied until a Full Travel Plan has been submitted to and approved in writing by the Local Planning Authority. The Travel Plan shall set out proposals (including targets, a timetable and enforcement mechanism) to promote travel by sustainable modes which are acceptable to the local planning authority and shall include arrangements for monitoring of progress of the proposals. The Travel Plan shall be implemented in accordance with the timetable set out in that plan.

 

 5         No part of the development hereby permitted shall be brought into use until all drives and any parking or turning areas are surfaced in a hard bound material (not loose gravel). The surfaced drives and any parking areas shall then be maintained in such hard bound material for the life of the development.

 

 6         No part of the development hereby permitted shall be brought into use until the Gedling Access Road is built and open to traffic in its entirety.

 

 7         No development shall take place until a Construction Environmental Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide for: (i) the parking of vehicles of site operatives and visitors; (ii) loading and unloading of plant and materials; (iii) storage of plant and materials used in constructing the development; (iv) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; (v) wheel washing facilities; (vi) measures to control the emission of dust and dirt during construction; (vii) a scheme for recycling/disposing of waste resulting from demolition and construction works.

 

 8         Before development is commenced there shall be submitted to and approved in writing by the Borough Council, details of a surface water drainage scheme for the site, based on sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development.  The surface water drainage scheme shall subsequently be implemented in accordance with the approved details before the development is completed and shall be retained for the lifetime of the development.

 

 9         Before development is commenced there shall be submitted into and approved in writing by the Local Planning Authority, (1) A tree / hedge protection plan to graphically show the locations of any tree / hedge and root protection barriers. A tree protection plan should be overlaid to graphically show root protection areas in accordance with BS 5837:2012; (2) Arboricultural impact assessment identifying what impacts might arise from the proposed works; (3) Arboricultural Method Statement (AMS). The AMS provides guidance as to how works might be mitigated or compensated for; (4) Details of any special engineering works and surfacing required near trees / hedges. The approved measures of protection shall be implemented in accordance with the approved details for the duration of the construction period.

 

10        Before development is commenced, there shall be submitted to and approved in writing by the Local Planning Authority a Desktop Study for Existing Ecological Information, to include: (1) Consultation with the Nottinghamshire Biological and Geological Records Centre (NBGRC); (2) An Extended phase 1 Habitat Survey; (3) Details of avoidance, mitigation and compensation measures, and opportunities for enhancements (4) Further surveys and/or assessment in relation to badger, common toad, grass snake and butterflies, and (5) Further information in relation to the loss of Open Mosaic Habitat, including mitigation and/or compensation measures and quantification of losses/gains using an ecological accounting approach. The development shall be implemented strictly in accordance with the approved details.

 

11        The detailed plans and particulars to be submitted as reserved matters in relation to landscaping shall include: (a) details of the size, species, positions and density of all trees and shrubs to be planted (in accordance with BS 8545:2014 Trees: from nursery to independence in the landscape), which shall consist of native species, ideally of local provenance, where possible; (b) details of the boundary treatments, including those to individual plot boundaries; (c) the proposed means of surfacing access roads, car parking areas, roadways and the frontages of properties (d) details of the mitigation and compensation for the loss of Open Mosaic Habitat (e) details of the mitigation and landscaping proposals in relation to dingy skipper (butterflies) and (f) a programme of implementation. The development shall be implemented in accordance with the approved details, which shall be retained for the lifetime of the development.

 

12        If within a period of five years beginning with the date of the planting of any tree or shrub, approved as reserved matters in relation to landscaping, that tree or shrub, or any tree or shrub that is planted in replacement of it, is removed, uprooted or destroyed or dies, or becomes in the opinion of the Local Planning Authority seriously damaged or defective, another tree or shrub of the same species and size as that originally planted shall be planted at the same place.

 

13        The detailed plans and particulars to be submitted as reserved matters in relation to scale shall include details of existing and proposed site levels in relation to adjacent properties. The development shall be implemented in accordance with the approved details.

 

14        The detailed plans and particulars to be submitted as reserved matters in relation to appearance shall include details of the materials to be used in the external elevations and roofs of the proposed buildings.  The development shall be carried out in accordance with the approved details, which shall be retained for the lifetime of the development.

 

15        Unless otherwise agreed by the Local Planning Authority, development must not commence until the following has been complied with: Site Characterisation: An assessment of the nature and extent of any potential contamination has been submitted to and approved in writing by the Local Planning Authority. This assessment must be undertaken by a competent person, and shall assess any contamination on the site, whether or not it originates on the site. Moreover, it must include; a survey of the extent, scale and nature of contamination and; an assessment of the potential risks to: human health, property, adjoining land, controlled waters, ecological systems, archaeological sites and ancient monuments. Submission of Remediation Scheme: Where required, a detailed remediation scheme (to bring the condition suitable for the intended use by removing unacceptable risks to critical receptors) should be submitted to and approved in writing by the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, an appraisal of remedial options, and proposal of the preferred option(s), and a timetable of works and site management procedures.

 

16        In the event that remediation identified in the Remediation Scheme is required to render the development suitable for use, the agreed remediation scheme shall be implemented in accordance with the approved timetable of works. Prior to occupation of any building(s) a Verification Report (that demonstrates the effectiveness of the remediation carried out) must be submitted and approved in writing by the Local Planning Authority.

 

17        In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority and once the Local Planning Authority has identified the part of the site affected by the unexpected contamination development must be halted on that part of the site. Prior to the first occupation of the development an Assessment must be undertaken in accordance with the requirements above, and where remediation is necessary a remediation scheme, together with a timetable for its implementation and verification reporting, must be submitted to and approved in writing by the Local Planning Authority.

 

Reasons

 

 1         To comply with the requirements of Section 92 of the Town and Country Planning Act 1990. The application is expressed to be in outline only in accordance with Article 5 of the Town and Country Planning (Development Management Procedure)(England) Order 2015.

 

 2         To comply with the requirements of Section 92 of the Town and Country Planning Act 1990.

 

 3         For the avoidance of doubt.

 

 4         To promote sustainable travel.

 

 5         In the interest of Highway safety.

 

 6         There is no alternative access from the highway.

 

 7         To protect the residential amenity of the area in accordance with the aims of Section 11 of the National Planning Policy Framework and Policy 10 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

 8         To prevent the increased risk of flooding; to improve and protect water quality; to improve habitat and amenity; and to ensure the future maintenance of the sustainable drainage structures, in accordance with the National Planning Policy Framework and  Policies 1 and 17 of the Aligned Core Strategy Submission Documents.

 

 9         To minimise any potential impacts on biodiversity and the landscape in accordance with Section 11 of the National Planning Policy Framework, Policy 17 of the Aligned Core Strategy for Gedling Borough (September 2014) and Policy LPD18 (July 2018).

 

10        To minimise any potential impacts on biodiversity in accordance with Section 11 of the National Planning Policy Framework, Policy 17 of the Aligned Core Strategy for Gedling (September 2014) and Policy LPD18.

 

11        To ensure that the landscaping of the proposed development accords with Policy 10 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

12        To ensure that the landscaping of the proposed development accords with Policy 10 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

13        To ensure a satisfactory development in accordance with the aims of Policy 10 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

14        To ensure a satisfactory development in accordance with the aims of Policy 10 of the Aligned Core Strategy for Gedling Borough (September 2014).

 

15        To ensure that practicable and effective measures are taken to treat, contain or control any contamination and to protect controlled waters in accordance with the aims of LPD7 and LPD10.

 

16        To ensure that practicable and effective measures are taken to treat, contain or control any contamination and to protect controlled waters in accordance with the aims of LPD7 and LPD10.

 

17        To ensure that practicable and effective measures are taken to treat, contain or control any contamination and to protect controlled waters in accordance with the aims of LPD7.

 

Reasons for Decision

 

The development has been considered in accordance with the National Planning Policy Framework, the Aligned Core Strategy for Gedling Borough (September 2014) and the Local Planning Document 2017, where appropriate.  In the opinion of the Borough Council, the proposed development largely accords with the relevant policies of these frameworks and plans. Where the development conflicts with the Development Plan, it is the opinion of the Borough Council that other material considerations indicate that permission should be granted.

 

Notes to Applicant

 

The detailed surface water drainage scheme to be submitted shall:  - require all flows to be attenuated to Qbar for the entire site;- include provision for the entire site to be drained to the surface water drainage system with appropriate run-off coefficients or other factors used to represent the differing run off characteristics of the various parts of the site;- include an exceedance check using microdrainage software to simulate the drainage system for the 100year + 30% climate change event for a range of durations from 15 minutes to 24 hours to assess where the drainage system may flood. If this occurs, provision must be made for the accumulated volumes and flows to be directed to the surface water attenuation areas; - demonstrate that the surface water drainage system is designed in accordance with CIRIA C635 and C753, and the National SUDS Standards;- demonstrate detailed design (plans, network details and calculations) in support of any surface water drainage scheme, including details of any attenuation system, and outfall arrangements. Calculations should demonstrate the performance of the designed system for a range of return periods and storm durations inclusive of the 1 in 1 year, 1 in 2 year, 1 in 30 year, 1 in 100 year plus climate change return periods;- confirm how on-site surface water drainage systems will be adopted and maintained in perpetuity to ensure long term operation at the designed parameters.

 

The attached permission is for development which will involve building up to, or close to, the boundary of the site.  Your attention is drawn to the fact that if you should need access to neighbouring land in another ownership in order to facilitate the construction of the building and its future maintenance you are advised to obtain permission from the owner of the land for such access before beginning your development.

 

Your attention is drawn to an informal planning guidance document which has been produced to try and define what sustainable development means in the context of air quality, and how to decrease levels by incorporating mitigation measures into scheme design as standard. (see: http://gedling.gov.uk/planningbuildingcontrol/planningpolicy/emerginglocalplan/supplementaryplanningdocuments/). It is therefore requested commitment to incorporate provision for an EV (electrical vehicle) charging point per dwelling; to allow future residents to charge electrical/hybrid vehicles into the future. Reference can be made to guidance produced by IET 'Code of Practice for EV Charging Equipment Installation' for details of charging points and plugs specifications.

 

No removal of hedgerows, trees or shrubs shall take place on site during the bird nesting season (1st March to 31st August inclusive in any given year), unless pre-commencement checks for nesting birds have been undertaken by an appropriately qualified ecologist and the outcome reported to the Borough Council.

 

The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to The Coal Authority on 0845 762   6848. Further information is also available on The Coal Authority website at www.coal.decc.gov.uk.Property specific summary information on past, current and future coal mining activity can be obtained from The Coal Authority's Property Search Service on 0845 762 6848 or at www.groundstability.com.

 

Planning Statement - The Borough Council has worked positively and proactively with the applicant in accordance with paragraph 38 of the National Planning Policy Framework (2018). Negotiations have taken place during the determination of the application to address adverse impacts identified by officers. Amendments have subsequently been made to the proposal, addressing the identified adverse impacts, thereby resulting in a more acceptable scheme and a favourable recommendation.

 

The applicant is advised that all planning permissions granted on or after 16th October 2015 may be subject to the Community Infrastructure Levy (CIL). Full details of CIL are available on the Council's website. The proposed development has been assessed and it is the Council's view that CIL IS PAYABLE on the development hereby approved.  The actual amount of CIL payable will be calculated when a decision is made on the subsequent reserved matters application.

 

 

 