Agenda and minutes

Planning Committee - Wednesday 4 March 2015 6.00 pm, NEW

Venue: Council Chamber. View directions

Contact: Lyndsey Parnell  Senior Elections and Members' Services Officer

Items
No. Item

283.

Apologies for Absence and Substitutions.

Minutes:

Apologies for absence were received from Councillors Barnfather, Bexon, Clarke and Lawrence.

 

The Chair informed Members of the recent passing of Councillor Clarke’s partner and asked Members to observe a minute’s silence.

284.

Declaration of Interests

Minutes:

None.

285.

Application No. 2014/1109- Land Adjacent Newstead Abbey Park pdf icon PDF 417 KB

Minutes:

Formation of six glamping cabins and supporting ancillary accommodation, within the existing context of the site.

 

The Service Manager, Planning and Economic Development, introduced applications no. 2014/1109 and 2014/1110, outlining the reasons for Officers’ recommendation to grant conditional planning permission and listed building consent.

 

Councillor Hewson entered the meeting.

 

Mr. Nigel Hawkins, on behalf of the applicant, Nottingham City Council, spoke in favour of the application.

 

Ms. Ann McCauley, a resident objector, spoke against the application.

 

RESOLVED To GRANT CONDITIONAL PLANNING PERMISSION:

 

Conditions

 

1.       The development must be begun not later than three years beginning with the date of this permission.

 

2.       The development hereby permitted shall be built in accordance with the submitted plans, Design and Access Statement and application forms received on 29th September 2014 drawing no's: 4393 (20) 253 (Proposed Service Location Plan), 11107/ENV/001 (Existing Drainage Layout), 4393 (20) 250 (Proposed Site Plan), 4393 (20) 252 (Site Plan), 4393 (40) 455 (Toilet Cabin Elevation), 4393 (30) 353 (WC Floor Plans and Elevations), 4393 (30) 352 (Floor Plans), 4393 (30) 351 (Floor Plans), 4393 (20) 251 (Site Plan), and 4393 (00) 001.

 

3.       The glamping cabins hereby permitted shall be used as holiday accommodation and shall not be occupied continuously by any person or persons for a period in excess of 28 days in any one single letting. There shall be no consecutive lettings beyond four weeks to the same person, family or group and a written record of lettings shall be kept and made available for inspection by the Local Planning Authority at their reasonable request.

 

4.       The temporary car parking for the unloading and loading of vehicles shall use the area marked on the plan received on 12th February 2015 drawing number: 4393 (20) 250 Revision E. The loading and unloading of vehicles shall operate in accordance with the email received on 12th February 2015. The loading and unloading of vehicles shall only occur between the hours of 09:00hrs and 21:00hrs and will only accommodate a maximum of 2 vehicles at any time. The maximum period to use this area shall be 1hr for each vehicle.

 

5.       Before development is commenced there shall be submitted to and approved by the Borough Council precise details of the materials to be used on the external elevations of the proposed development. The development shall be carried out in accordance with the approved details.

 

6.       The development hereby approved shall be carried out in accordance with the recommendations of the Arboricultural Implications Assessment and Arboricultural Method Statement, BS 5873: 2012, Dated 3 September 2014 revised 16 September 2014.

 

7.       The proposed bird and bat boxes shall be sited in the locations as indicated on the plan received by email on 2nd February 2015 and all works shall be carried out in accordance with the recommendations of sections 5 and 6 of the Protected Species Survey dated September 2014. The bird and bat boxes shall be installed before the development is first brought into use.

 

8.       Before development hereby permitted is  ...  view the full minutes text for item 285.

286.

Application No. 2014/1110- Land Adjacent Newstead Abbey Park pdf icon PDF 360 KB

Minutes:

Formation of six glamping cabins and supporting ancillary accommodation, within the existing context of the site.

 

RESOLVED To GRANT LISTED BUILDING CONSENT:

 

Conditions

 

1.       The development must be begun not later than three years beginning with the date of this permission.

 

2.       The development hereby permitted shall be built in accordance with the submitted plans, Design and Access Statement and application forms received on 29th September 2014 drawing no's: 4393 (20) 253 (Proposed Service Location Plan), 11107/ENV/001 (Existing Drainage Layout), 4393 (20) 250 (Proposed Site Plan), 4393 (20) 252 (Site Plan), 4393 (40) 455 (Toilet Cabin Elevation), 4393 (30) 353 (WC Floor Plans and Elevations), 4393 (30) 352 (Floor Plans), 4393 (30) 351 (Floor Plans), 4393 (20) 251 (Site Plan), and 4393 (00) 001.

 

3.       Prior to any development taking place a full recording and written specification of the surfacing and ground condition of the route of the proposed (electric, water and foul) services along with a method statement for the works required to connect the services should be submitted to and approved by the Local Planning Authority. Details should include the methodology and dig technology to be used and must include a comprehensive scheme to return the proposed routes to the original written specification once the development has been completed. The proposed works and decommissioning of the site shall be implemented in accordance with the approved details.

 

Reasons

 

1.       In order to comply with Section 51 of the Planning and Compulsory Purchase Act 2004.

 

2.       For the avoidance of doubt.

 

3.       To ensure that the proposed works do not impact on the fabric or setting of a Listed Building and Registered Garden in accordance with the aims and objectives of Policy ENV21, the National Planning Policy Framework and the Planning (Listed Buildings and Conservation) Act 1990.

 

Reasons for Decision

 

In the opinion of the Borough Council the proposed development would result in no significant undue impact on the character and setting of a Listed Building and Registered Park and Garden. The development has been considered in accordance with the National Planning Policy Framework, the Aligned Core Strategy for Gedling Borough (September 2014) and the Gedling Borough Council Replacement Local Plan (Certain Policies Saved 2014), where appropriate. It is the opinion of the Borough Council that where the development conflicts with the Development Plan that other material considerations indicate that permission should be granted. The benefits of granting the proposal outweigh any adverse impact to the setting of the Listed Building and Registered Park and Garden.

 

 

 

 

 

 

 

 

 

287.

Application No. 2014/1356- Arnold Hill Academy, Gedling Road, Arnold pdf icon PDF 701 KB

Additional documents:

Minutes:

Demolition of existing school buildings and erection of a new school building with associated access, plant, parking, landscaping and sports pitch.

 

The Service Manager, Planning and Economic Development, introduced the application, informing Members of an additional letter received from local residents following publication of the agenda. The Service Manager also drew Members’ attention to a proposed revised condition, as circulated prior to the meeting, and an amendment to condition 13 to remove reference to condition 10.

 

Mr Bradley, Governor at Anold Hill Academy spoke in favour of the application.

 

RESOLVED To GRANT PLANNING PERMISSION, subject to the amended conditions:

 

Conditions

 

 1         The development must be begun not later than three years beginning with the date of this permission.

 

 2         The development hereby permitted shall be constructed in accordance with the following approved plans: Revised Illustrative Master Plan (ALA231L00) received on 19th February 2015; Revised General Layout Plan (ALA 231 L02) received on 20th February 2015; Ground Floor Plan (1330-PL-01), First Floor Plan (1330-PL-02), Second Floor Plan (1330-PL-03),  Roof Plan (1330-PL-04), Elevations (1 of 2) (1330-PL-05), Elevations (2 of 2) (1330-PL-06), Sections (1 of 2) (1330-PL-07), Sections (2 of 2) (1330-PL-08), External Views (1 of 2) 1330-PL-09, External Views (2 of 2) (1330-PL-10), Internal Views (1330-PL-11), Sixth Form Centre - Existing Plans Elevations (1330-PL-12), Sixth Form Centre - Proposed Plans Elevations (1330-PL-13), Site Sections (ALA231L03), BB103 Plans _ Areas (ALA231L04), Fencing Arrangement (excluding the bin store location) (ALA231L05), Detailed Plan 1 of 3 (ALA231L07), Detailed Plan 2 of 3 (ALA231L08), Detailed Plan 3 of 3 (ALA231L9), Sports Pitch Analysis (ALA231 L12), Site Circulation (ALA231 L13), Tree Retention and Removal (ALA231L07), Planning Application Boundary (ALA231L15), Planting Plan (ALA231L16), External Lighting Philosophy Proposed Site Plan (EX-100-03), Preliminary Ecology Appraisal (July 2014), Transport Statement (Curtins Ref: TPLE1149/TS), Geothermal Desk Study (July 2014), Acoustic Feasibility Report by Matt MacDonald (September 2014), and The Travel Plan, all received on 6th December 2014.

 

 3         Within 10 weeks from the date of this approval there shall be submitted to and approved by the Borough Council precise details of the materials to be used in the external elevations of the proposed development. Once approved the development shall be carried out in accordance with these details unless otherwise agreed in writing by the Borough Council.

 

 4         Unless otherwise agreed by the Local Planning Authority, development must not commence until the following has been complied with: Site Characterisation: An assessment of the nature and extent of any potential contamination has been submitted to and approved in writing by the Local Planning Authority. This assessment must be undertaken by a competent person, and shall assess any contamination on the site, whether or not it originates on the site. Moreover, it must include; a survey of the extent, scale and nature of contamination and; an assessment of the potential risks to: human health, property, adjoining land, controlled waters, ecological systems, archaeological sites and ancient monuments. Submission of Remediation Scheme: Where required, a detailed remediation scheme (to bring the site to a condition  ...  view the full minutes text for item 287.

288.

Planning Delegation Panel Action Sheets pdf icon PDF 41 KB

Minutes:

RESOLVED:

 

To note the information.

289.

Future Planning Applications pdf icon PDF 93 KB

Minutes:

RESOLVED:

 

To note the information.

290.

Any other items which the Chair considers urgent.

Minutes:

None.