51 Application no. 2023/0851 - Leivers Court, Douro Drive, Arnold PDF 617 KB
Minutes:
Demolition of existing care home and construction of a 3-storey building to incorporate 22 flats providing supported accommodation, staff office, and communal hub, and the erection of 8 semi-detached dwellings including access, parking and turning.
The Development Manager introduced the report.
RESOLVED:
To Grant Planning Permission: Subject to the owner(s) entering into a planning obligation secured through a Section 106 legal agreement with the Borough Council as the Local Planning Authority and the County Council to secure an affordable housing, parks and public open space enhancements, bus stop infrastructure, a healthcare contribution and a local labour agreement; and the conditions listed for the reasons set out within the report
Conditions
1. The development must be begun not later than the expiration of three years beginning with the date of this permission.
2. The development authorised by this permission shall be carried out in complete accordance with the approved drawings and report specification listed below:
Design and Access Statement
Phase 1 Geo-Environmental Desk Study (GI Associates)
Existing Tree Survey Report (Paul Hicking Associates)
Drainage Strategy (BSP Consulting)
Flood Risk Statement (BSP Consulting)
Levels Strategy (BSP Consulting)
Swept Path Analysis (BSP Consulting)
Protected Species Survey (Paul Hicking Associates)
Emergence Survey (Thompson Ecology)
Technical Note (Thompson Ecology)
47492_T – Topographical Survey
2339-01 – Tree Survey and Root Protection Areas
2759/P 100 – Site Location Plan
2759/P 102D – Proposed Site Plan
2759/P 103 – Proposed Site Section
2759/P 200A – Plots 1-4
2759/P 201A – Plots 5-6
2759/P 202A – Plots 7-8
2759/P 203C GF Plans – Flats
2759/P 204C FF Plans – Flats
2759/P 205C SF Plans – Flats
2759/P 206B Elevations – Flats
3. Prior to occupation, details of the proposed arrangements and plan for future management and maintenance of the private road including associated drainage should be submitted to and approved in writing by the Local Planning Authority. The private road and drainage shall thereafter be maintained in accordance with the approved management and maintenance details, until such time that a private Management and Maintenance Company has been established.
4. The access into the site shall remain hard surfaced in a bound material. The surfaced drive shall then be maintained in such hard-bound material for the life of the development.
5. No part of the development hereby approved shall commence until a detailed surface water drainage scheme based on the principles set forward by the approved Flood Risk Assessment (FRA) and Drainage Strategy LCDD-BSP-XX-XX-T-W-0001-P01_Drainage_Strategy, 25th October 2023, BSP Consulting., has been submitted to and approved in writing by the Local Planning Authority in consultation with the Lead Local Flood Authority. The scheme shall be implemented in accordance with the approved details prior to completion of the development. The scheme to be submitted shall:
· Demonstrate that the development will use SuDS throughout the site as a primary means of surface water management and that design is in accordance with CIRIA C753 and NPPF Paragraph 169.
· Limit the discharge generated by all rainfall events up to the 100 year plus 40% (climate ... view the full minutes text for item 51