Planning Application 2023/0135

Meeting: 10/01/2024 - Planning Committee (Item 60)

60 Application no. 2023/0135 - Land North West, Park Road, Calverton pdf icon PDF 389 KB

Minutes:

Application for the approval of reserved matters (layout, landscaping, scale and appearance) for the erection of 132 dwellings and associated infrastructure, pursuant to outline approval 2018/0607 (re-plan of reserved matters approvals 2020/0020 and 2022/0584 with 363 units in total).

 

The Development Manager introduced the report.

 

RESOLVED:

 

To grant reserved matters approval, subject to the imposition of conditions, as set out in the report:

 

1.             This permission shall be read in accordance with the application form and following list of approved drawings:

Document

Submitted

Reference

Planning Layout

28/11/2023

CC-PL-01 Rev D

Charter Plan

28/11/2023

CA-CP-01 Rev B

Location Plan

21/09/2023

CA-LP-01 Rev A

Alnmouth Elevation

21/09/2023

AL_MA_End_R21-903 Rev C

Danbury Elevation

21/09/2023

Da_MA_End_R21-903 Rev C

Deepdale Elevation

21/09/2023

Dp_MA_End_R21-903 Rev A

Glenmore Elevation

21/09/2023

Gl_MA_End_R21-903 Rev B

Kingley Elevation

21/09/2023

Kg_MA_End_R21-903 Rev A

Sherwood Elevation

21/09/2023

Sh_MA_Det_R21-903 Rev C

Barnwood F1 Elevation

21/09/2023

Bw_MA_Det_R21-903 Rev C (Render)

Barnwood Elevation

21/09/2023

Bw_MA_Det_R21-903 Rev C

Saunton F1 Elevation

21/09/2023

Sa_MA_End_R21-903 Rev C (Render)

Saunton Elevation

21/09/2023

Sa_MA_End_R21-903 Rev C

Braunton F1 Elevation

21/09/2023

Br_MA_Mid_R21-903 Rev C (Render)

Braunton Elevation

21/09/2023

Br _MA_Mid_R21-903 Rev C

Rivington Elevation

21/09/2023

Ri_MA_Det_R21-903 Rev C

Burnham Elevation

21/09/2023

Bu_MA_Det_R21-903 Rev C

Kennet Elevation

21/09/2023

Ke_MA_End_R21-903 Rev C

Brampton F1 Elevation

21/09/2023

Bt_MA_Det_R21-903 Rev C (Render)

Brampton Elevation

21/09/2023

Bt_MA_Det_R21-903 Rev C

Selwood Elevation

21/09/2023

Se_MA_Det_R21-903 Rev C

Selwood F1 Elevation

21/09/2023

Se_MA_Det_R21-903 Rev C (Render)

Kielder Elevation

21/09/2023

Ki_MA_End_R21-903 Rev C

Greenwood F1 Elevation

21/09/2023

Gw_MA_Det_R21-903 Rev C (Render)

Greenwood Elevation

21/09/2023

Gw_MA_Det_R21-903 Rev C

Ennerdale Elevation

28/11/2023

En_MA_End_R21G-903 Rev B

 

 

 

The development shall thereafter be undertaken in accordance with these plans/details.

 

2.       No part of the development hereby permitted shall be brought into use until all drives and parking areas are surfaced in a bound material (not loose gravel). The surfaced drives and parking areas shall then be maintained in such bound material for the life of the development.

 

3.       No part of the development hereby permitted shall be brought into use until the access driveways and parking areas are constructed with provision to prevent the unregulated discharge of surface water from the driveways and parking areas to the public highway. The provision to prevent the unregulated discharge of surface water to the public highway shall then be retained for the life of the development.

 

4.       The landscaping scheme as approved shall be carried out in the first planting season following the completion of the development. Any trees, shrubs or plants that die within a period of five years from the completion of the development, or are removed and/or become seriously damaged or diseased in that period, shall be replaced (and if necessary continue to be replaced) in the first available planting season with others of similar size and species.

 

Reasons

 

1.       For the avoidance of doubt.

 

2.       To reduce the possibility of deleterious material being deposited on the public highway (loose stones etc) and to comply with policy LPD61.

 

3.       To ensure surface water from the site is not deposited on the public highway causing dangers  ...  view the full minutes text for item 60