Issue - meetings

Planning Application 2020/0694

Meeting: 13/10/2021 - Planning Committee (Item 47)

47 Application No. 2021/0694 - Land to the South Burton Road, Gedling pdf icon PDF 506 KB

Minutes:

Erection of 120 dwellings with associated access, landscaping and infrastructure (approval of matters reserved by outline consent 2019/1186 (appearance, landscape, layout and scale)).

 

Clare Thornton, Senior Planner of Miller Homes (The Applicant), spoke in support of the application.

 

The Principal Planning Officer introduced the report. He advised Members that further to the publication of the report additional comments had been received from Severn Trent Water who had raised no objections to the application, subject to entering a Section 106 connection approval agreement which would secure a foul pumping station on the site.  He added that a letter of objection had also been received which raised no new issues. 

 

RESOLVED:

 

To Grant reserved matters approval, subject to the imposition of conditions, as set out in the report:

 

Conditions

 

1.This permission shall be read in accordance with the application form and following list of approved drawings:

- Site location plan (ref: 6097-L-05A)

- Planning layout (ref: G-DPL-01D)

- Materials layout plan (ref: BRG/MAT01 Rev C)

- Affordable housing plan (ref: BRG/AHP/01 Rev C)

- House Type Pack March 2021 (ref: BRG/HTP01)

- POS Landscape proposals (ref: 06097-FPCR-XX-XX-DR-L-0001-P09)

- Detailed LEAP plan (ref: 06097-FPCR-XX-XX-DR-L-0007-P06)

- On plot landscaping proposals sheets 1 to 4 (ref: 06097-FPCR-XX-XX-DR-L_0002-P04, 0003-P04, 0004-P04 and 0005-P04)

- Detailed hardworks and boundary treatment plan (ref: 06097-FPCR-XX-XX_DR-L-0006-P05) - Drainage/alternative pond layout/levels plan (ref: 22069-SK03 Rev F)

- Swept path analysis plan (ref: 22069-108-A)

 

The development shall thereafter be undertaken in accordance with these plans/details.

 

2. No above ground works shall commence until samples of external facing and roofing materials have been submitted to and approved in writing by the Local Planning Authority. Development shall thereafter be carried out in accordance with the approved details.

 

3. Development shall proceed in accordance with the approved Arboricultural Assessment, which identifies the trees to be retained and protected; appropriate fencing to protect trees to be retained shall be in situ prior to commencement of development and be retained whilst development is underway that would impact on the trees and hedges to be retained.

 

4. Notwithstanding condition 1 above, no above ground works shall commence until details of the existing and proposed ground and finished floor levels of the site and approved building[s], including sections, have been submitted to and approved in writing by the local planning authority. The development shall be carried out thereafter in accordance with the approved details.

 

5. No above ground works shall commence until details of the new road have been submitted to and approved in writing by the Local Planning Authority including longitudinal and cross-sectional gradients, street lighting, drainage and outfall proposals, construction specification, provision of and diversion of utilities services, and any proposed structural works. The development shall, thereafter, be implemented in accordance with the details as approved.

 

6. No part of the development hereby permitted shall be brought into use until the access driveways and parking areas are constructed with provision to prevent the unregulated discharge of surface water from the driveways and parking areas to the public highway.  ...  view the full minutes text for item 47