Issue - meetings

Planning Application 2020/0938

Meeting: 21/10/2020 - Planning Committee (Item 54)

54 Application No. 2020/0938 - Shopping Centre, Carlton Square, Carlton pdf icon PDF 538 KB

Minutes:

Reconfiguration of existing car parking, pedestrian routes, boundary treatments and formation of new vehicular access to Burton Road.

 

The Principal Planning Officer introduced the report.

 

RESOLVED:

 

To Grant Full Planning Permission subject to the conditions listed for the reasons set out in the report.

 

  1. The development herby permitted shall commence before the expiration of 3 years from the date of this permission.

 

  1. This permission shall be read in accordance with the application form and following list of approved drawings:

 

7593-06 PROPOSED SITE PLAN – GA

7593-07 PROPOSED SITE PLAN – DETAILED

7593-08 PROPOSED LIGHTING PLAN

7593-11 SITE DETAILS AND FURNITURE

 

CSN-BWB-HGNXX-DR-TR-110_S2-P1 – Swept Path Analysis

CSN-BWB-HGNXX-DR-TR-111_S2-P1 – Swept Path Analysis

CSN-BWB-HGNXX-DR-TR-112_S2-P1 – Swept Path Analysis

CSN-BWB-HML-XX-DR-TR-100_S2-P1 – General Arrangements

 

The development shall thereafter be undertaken in accordance with these plans/details.

 

3. The car parking areas shall be surfaced in a bound material with the parking bays clearly delineated in accordance with drawing no. 7593/07 Rev B. The parking areas shall be maintained in the bound material for the life of the development and shall not be used for any purpose other than the parking and turning of vehicles.

 

4. The accesses into the car parking areas shall be hard surfaced and constructed with provision to prevent the unregulated discharge of surface water from the accesses to the public highway. The accesses shall remain hard surfaced with the provision to prevent the unregulated discharge of surface water to the public highway shall then be retained for the life of the development.

 

5. Prior to the commencement of development, a scheme of landscaping showing the location, species and size of specimens to be planted shall be submitted to and approved in writing by the Local Planning Authority.  The scheme as approved shall be carried out in the first planting season following the completion of each development phase. Any trees, shrubs or plants that die within a period of five years from the completion of each development phase, or are removed and/or become seriously damaged or diseased in that period, shall be replaced (and if necessary continue to be replaced) in the first available planting season with others of similar size and species.

 

6    Prior to commencement of the development a Construction Emission Management Plan (CEMP) for minimising the emission of dust and other emissions to air during the site preparation and construction shall be submitted to and approved in writing by the Local Planning Authority.  The CEMP must be prepared with due regard to the guidance produced by the Council on the assessment of dust from demolition and construction and include a site specific dust risk assessment.  All works on site shall be undertaken in accordance with the approved CEMP.

 

7    Prior to completion of the development hereby approved the electric vehicle charging points identified on drawing 7593-07 PROPOSED SITE PLAN – DETAILED shall be installed and fully operational.

 

 

 

Reasons

 

  1. To comply with the requirements of Section 91(1) of the Town and Country Planning Act 1990 (as amended).
  2. For the avoidance of  ...  view the full minutes text for item 54