Planning Application 2018/0551

Meeting: 05/09/2018 - Planning Committee (Item 50)

50 Application Number 2018/0551 - Colwick Business Park Road No 2, Colwick. pdf icon PDF 869 KB

Minutes:

Demolition of two existing two storey office buildings, partial demolition of existing block of light industrial/ warehouse buildings. Construction of new three storey office building including roof plant screens and associated parking and landscape works.

 

The Service Manager – Development Services introduced the report.

 

RESOLVED toGRANT PLANNING PERMISSION subject to the following conditions:

 

Conditions

 

 1         The development must be begun not later than three years beginning with the date of this permission.

 

 2         The development hereby approved shall be constructed in accordance with the plans and documents received on 5th June 2018 drawing no's: Drainage Strategy (E143_5000_p02); Drainage Layout Sheet 1 of 2 (E143_5001_P03); Drainage Layout Sheet 2 of 2 (E143_5002_p03); External Levels Sheet 1 of 2 (E143_5003_P02); External Levels Sheet 2 of 2 (E143_5004_P02); Manhole Schedules (E143_5006_P01); Typical Details (E143_5005_P01); Proposed Section AA (16156-A-4003); Proposed NE and NW Planning Elevations (16156-A-4011); Foundation and Ground Floor Slab Sections (E143-CHG-Z1-00-DR-S-0003); Proposed SE and SW Planning Elevations (16156-A-4010_p03); Bin Store Details (16156-A-7011); Design and Access Statement June 2018; Contamination Assessment; Proposed Hard Landscaping Details (16156-A-7008 - P02); External Lighting Layout and EV Charging Point (C17010-E-010); Proposed Site Plan (16156-A-2001 - P07); Proposed Roof Plan (16156-A-3004_P04); Demolition Plan (16156-A-1000); Proposed Second Floor Plan (16156-A-3003); Proposed First Floor Plan (16156-A-3002); Proposed Ground Floor Plan (16156-A-3001); Existing Site Plan (16156-A-1001_p03); Transport Assessment March 2015; and External Material Finishes.

 

 3         The development hereby approved shall be carried out in accordance with the approved Flood Risk Assessment (FRA) Rev B 17/08/18 Encon Associates Limited and the following mitigation measures detailed within the FRA: 1) Finished floor levels are set no lower than 21.78m above Ordnance Datum (AOD). 2) Flood resilience measures are implemented to at least 22.31m AOD as detailed in the FRA.

 

 4         The development shall be carried out strictly in accordance with the Contaminated Land Assessment (Geodyne ref. 2017.03.28-D34084 Geodyne - Contamination Assessment).

 

 5         Prior to occupation of any building(s) a Verification Report (that demonstrates the effectiveness of the gas membrane remediation to be carried out, as confirmed by email dated 22nd June 2018) must be submitted and approved in writing by the Local Planning Authority.

 

 6         No part of the development hereby permitted shall be more than 75% occupied before or until a Travel Plan including a Car Parking Management Plan has been submitted to and approved in writing by the Local Planning Authority. The Travel Plan shall set out proposals (including targets, a timetable and enforcement mechanism) to promote travel by sustainable modes which are acceptable to the local planning authority and shall include arrangements for monitoring of progress of the proposals. The Travel Plan shall be implemented in accordance with the timetable set out in that plan unless otherwise agreed in writing by the Local Planning Authority.

 

 7         Before development is commenced there shall be submitted to and approved in writing by the Borough Council details of a Local Employment Agreement to cover the construction of the development hereby permitted and the creation of new jobs in the local area.  ...  view the full minutes text for item 50